![Metal-Fach GRAND PELLET 100 Technical And Operational Documentation Download Page 25](http://html1.mh-extra.com/html/metal-fach/grand-pellet-100/grand-pellet-100_technical-and-operational-documentation_1777053025.webp)
METAL-FACH
Heating Technology
23
Connection of the boiler to the heating system
(Installer)
Boiler connection to the central heating system should be performed by a firm authorized by the manufacturer
and the fact of a proper connection should be confirmed on a guarantee card attached to this manual. Boiler
should be connected according to producer recommendations, in accordance with this manual.
NOTE!
It is recommended to perform the first start-up of the boiler in accordance with the
guidelines included in the Operation and Technical Documentation by a person holding a
valid license (information about persons authorised to start up the boiler is available from
the Producer - phone: +48 85 711 94 56).
NOTE!
The return water temperature from the system to the central heating boiler should not be
lower than 45ºC.
NOTE!
It is required to connect the boiler to the heating system using a four-way valve.
Summary of Contents for GRAND PELLET 100
Page 1: ......
Page 2: ......
Page 10: ...METAL FACH Heating Technology 8 Boiler GRAND PELLET 15 34 ...
Page 12: ...METAL FACH Heating Technology 10 Boiler GRAND PELLET 50 150 ...
Page 42: ...METAL FACH Heating Technology 40 ...
Page 48: ...METAL FACH Heating Technology 46 ...
Page 50: ...METAL FACH Heating Technology 48 ...
Page 52: ...METAL FACH Heating Technology 50 ...
Page 59: ......
Page 60: ......