ventilation requirements are the same as for boiler houses of smaller capacity; in addition, in boiler
houses whose capacity exceeds 400 kW, in addition to supply and exhaust ventilation, there should be
mechanical ventilation, activated periodically during fuel filling and slagging of boilers, ensuring a
minimum of 10 full air changes per hour;
●
natural lighting shall be provided in the boiler room, illuminating the boiler from the front, and the
window area shall be a minimum of 1/15 of the boiler room floor area; half of the windows installed
shall be operable; electric lighting and an electric outlet, not exceeding 24 V, shall also be provided in the
room;
●
there should be a drainage sump in the floor to allow cooling of the water and its capacity should be
equal to the water capacity of the largest boiler, but not more than 2 m
3
;
●
in the boiler room, the thermal pipes should be insulated;
●
The boiler position with the minimum required distances is shown in the boiler room diagram below.
Minimum distances for positioning the boiler in the boiler room
Summary of Contents for GRAND PELLET 100
Page 1: ......
Page 2: ......
Page 10: ...METAL FACH Heating Technology 8 Boiler GRAND PELLET 15 34 ...
Page 12: ...METAL FACH Heating Technology 10 Boiler GRAND PELLET 50 150 ...
Page 42: ...METAL FACH Heating Technology 40 ...
Page 48: ...METAL FACH Heating Technology 46 ...
Page 50: ...METAL FACH Heating Technology 48 ...
Page 52: ...METAL FACH Heating Technology 50 ...
Page 59: ......
Page 60: ......