![Metal-Fach GRAND PELLET 100 Technical And Operational Documentation Download Page 34](http://html1.mh-extra.com/html/metal-fach/grand-pellet-100/grand-pellet-100_technical-and-operational-documentation_1777053034.webp)
METAL-FACH
Heating Technology
32
Wiring diagram - additional module B
Wiring diagram - additional module B, where:
M3 - temperature sensor of controlled circuit (mixer3) CT4,
M4 temperature sensor for regulated circuit (mixer 4) CT4,
RM3 - Mixer room thermostat 3,
RM4 - room thermostat for mixer 4,
FS - fuel level sensor for BU feeder operation,
H2 - voltage input to control the reserve boiler or to signal alarms, or for the hot water circulation pump,
RELAY - relay,
L N PE - mains supply 230V~,
PM 3/4 - mixer pump 3/4,
SM 3/4 - 3/4 mixer actuator,
BU - fuel feeder from the bunker to the hopper in the boiler,
CPU - control,
A - ecoMAX 860P2-T regulator A module.
Summary of Contents for GRAND PELLET 100
Page 1: ......
Page 2: ......
Page 10: ...METAL FACH Heating Technology 8 Boiler GRAND PELLET 15 34 ...
Page 12: ...METAL FACH Heating Technology 10 Boiler GRAND PELLET 50 150 ...
Page 42: ...METAL FACH Heating Technology 40 ...
Page 48: ...METAL FACH Heating Technology 46 ...
Page 50: ...METAL FACH Heating Technology 48 ...
Page 52: ...METAL FACH Heating Technology 50 ...
Page 59: ......
Page 60: ......