Metacon-Next
OHD-C EI(1) 60 / EI(2) 90 / EW 90
18-05-2021
User manual
art nr: 89022
Rev: 2
8
6
Product
See the product leaflet and the optional BOM (Bill Of Materials) for this.
7
Installation preparations
Before the installation of the door can be started, the following things must be checked:
Before proceeding with the installation, the installer must have taken note of the
contents of this user manual.
It is the responsibility of the installer to be aware of the local regulations concerning
the installation of the door (e.g. Working Conditions Act).
Check that the work area is accessible and has enough space for working, then
cordon off the work area. Pay attention to the following points:
-
Check the clear width and height and the available side and top space; the
dimensions according to the order are leading.
-
Check the mounting surface for obstacles.
-
Check that the surface is flat before mounting.
-
Check that the walls, floor and lintel are perpendicular and straight.
-
Check that the correct electrical connections are in place.
-
Assess whether the surface offers sufficient strength for the structure;
contact the client when in doubt about this.
Check all parts using the packing slip and/or order confirmation, and/or refer to the
list of all parts using the optional BOM (Bill of Materials) in the user manual.
7.1
Essential tools for installation
The required tools cannot be determined by Metacon, as this depends on the installation
situation. It is up to the installer to determine the suitable tools.