4-42 - POWERHEAD
90-830234R3
DECEMBER 1997
Check Valves
REMOVAL
•
Remove carburetors and intake manifold/reed
block assemblies.
•
Grasp carrier and remove carrier/check valve as-
sembly from crankcase cover.
a
51621
a - Carrier/Check Valve Assembly
•
Push check valve out of carrier. If nylon ball within
check valve is stuck or carrier is charred, replace
check valve and/or carrier as required.
IMPORTANT: SINGLE HOLE side of check valve
MUST FACE CRANKCASE.
b
a
d
c
51131
a - Check Valve
b - Carrier
c - Single Hole
d - Double Hole
INSTALLATION
•
Install check valve (if removed) inside of carrier
(single hole of valve faces tapered end of carrier).
•
Align carrier tab with slot in crankcase cover and
insert check valve/carrier assembly into cover.
a
b
c
51621
a - Check Valve/Carrier Assembly
b - Slot
c - Crankcase Cover
•
Clean mating surfaces of crankcase cover and
intake manifold. Install new gaskets.
•
Install intake manifold/reed block assemblies to
crankcase cover. Refer to PAGE 4-58 for torque
specification and tightening sequence.
•
Install carburetors. Torque carburetor (AIR BOX)
stud nuts to 100 lb. in. (11.3 N
m).
•
Carburetors MUST BE SYNCHRONIZED. Refer
to SECTION 2C for proper procedures.
•
Reinstall air box cover.
•
Reinstall top cowling.
Piston and Piston Rings
IMPORTANT: If engine was submerged while en-
gine was running, piston pin and connecting rod
may be bent. If piston pin is bent, piston must be
replaced. Piston pins are not sold separately be-
cause of matched fit into piston. If piston pin is
bent, connecting rod must be checked for
straightness (refer to “Connecting Rods” for
checking straightness).
•
Inspect piston for scoring and excessive piston
skirt wear.
Summary of Contents for 100 FourStroke
Page 5: ...1 A 52485 IMPORTANT INFORMATION SPECIFICATIONS ...
Page 13: ...1 C IMPORTANT INFORMATION GENERAL INFORMATION ...
Page 23: ...1 D IMPORTANT INFORMATION OUTBOARD INSTALLATION ...
Page 37: ...A 2 53970 ELECTRICAL IGNITION ...
Page 81: ...B 2 11669 ELECTRICAL CHARGING AND STARTING SYSTEM ...
Page 108: ...C 2 22480 ELECTRICAL TIMING SYNCHRONIZING ADJUSTING ...
Page 119: ...D 2 ELECTRICAL WIRING DIAGRAMS ...
Page 146: ...A 3 53992 FUEL SYSTEM FUEL PUMP ...
Page 148: ...90 830234R3 DECEMBER 1997 FUEL SYSTEM 3A 1 Notes ...
Page 161: ...B 3 FUEL SYSTEM CARBURETOR ...
Page 190: ...C 3 FUEL SYSTEM OIL INJECTION ...
Page 192: ...90 830234R3 DECEMBER 1997 FUEL SYSTEM 3C 1 Notes ...
Page 211: ...4 20032 POWERHEAD ...
Page 215: ...90 830234R3 DECEMBER 1997 POWERHEAD 4 3 Notes ...
Page 292: ...A 5 MID SECTION CLAMP SWIVEL BRACKETS DRIVE SHAFT HOUSING ...
Page 294: ...90 830234R3 DECEMBER 1997 MID SECTION 5A 1 Notes ...
Page 317: ...5 51485 B MID SECTION POWER TRIM S N USA 0G360002 BEL 9934136 BELOW ...
Page 359: ...C 5 55331 MID SECTION POWER TRIM S N USA 0G360003 BEL 9934137 UP ...
Page 364: ...5C 4 MID SECTION 90 830234R3 DECEMBER 1997 Notes ...
Page 408: ...5 D MID SECTION SHOCK ABSORBER ...
Page 413: ...5 E MID SECTION MANUAL TILT ...
Page 451: ...A 6 791 H LOWER UNIT GEAR HOUSING ...
Page 489: ...6 B LOWER UNIT JET DRIVE ...
Page 491: ...90 830234R3 DECEMBER 1997 LOWER UNIT 6B 1 Notes ...
Page 513: ...A 7 50099 ATTACHMENTS CONTROL LINKAGE THROTTLE SHIFT LINKAGE ...
Page 543: ...7 B ATTACHMENTS CONTROL LINKAGE TILLER HANDLE ...
Page 545: ...90 830234R3 DECEMBER 1997 ATTACHMENTS CONTROL LINKAGE 7B 1 Notes ...
Page 567: ...51605 8 MANUAL STARTER ...
Page 569: ...90 830234R3 DECEMBER 1997 MANUAL STARTER 8A 1 Notes ...