background image

10

11

11

18

P 6

Please retain product label and instructions for future reference

             

Step 11

Parts needed -              & 

Fix Fascias 

(No. 11)

 and Finials 

(No. 18)

 

using 40mm screws.

 

Pre drill holes to avoid splitting. Ensure to 

the trap the felt between the fascia and 

building.

12x40mm screws

 

 

40mm 

screw

Step 9 

Cut the Felt into 3 sheets and lay onto

roof as shown in diagram ensuring there is a 

50mm overhang around the sides. 

Fix using felt tacks at 100mm intervals.

60x Felt Tacks

 

 

Felt 

tacks 

Step 10

Parts needed - 

At the back of the building, fix the two 

Cover Trims 

(No. 10)

  to either end of the 

side panels.

Use 3x30mm screws per trim. 

3x30mm screws

 

 

30mm 

screw

11

11

18

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

10

18

11

Step 12

        

Parts needed - 

 

Place a Window Cross 

(

No. 22

against the 

inside of each window. Position the frame

centrally to the window and fix using 

4x20mm screws per frame.

15x20mm screws.

20mm 

screw

1!

2!

Pre drill 

hole

22

22

Summary of Contents for Tulip Playhouse 02TUL411411-V4-PEFC

Page 1: ...asphalt or any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base...

Page 2: ...5mm Cover Trims 12x45x1155mm Fascia Board 12x95x980mm Roof Eave 28x28x1520mm FS2828 1500mm SR1295 1470mm FS2828 1155mm S1245 1155mm FAS980x95mm FS2828 1520mm QTY x2 QTY x2 QTY x4 QTY x3 QTY x5 18 15 F...

Page 3: ...2X203mm BEADING 9X12X247mm QTY x4 QTY x4 22 Window AI 02PHOW V1 QTY x3 20 21 Poppy Playhouse Door and Window Pack Tulip Playhouse Door and Window Pack Door AI 02TUL411411 V3D 20 Window AI 02PHOW V1 QT...

Page 4: ...8 along the joists and against the floor sheet Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screw for each board along the dotted lines shown on the illust...

Page 5: ...the roof ensuring they come together at the top using 40mm screws directly through the roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30m...

Page 6: ...here is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 60x Felt Tacks Felt tacks Step 10 Parts needed At the back of the building fix the two Cover Trims No 10 to either end...

Page 7: ...14x30mm screws 30mm screw Beading Beading 26 26 23 24 25 25 25 25 26 26 Step 15 Parts needed Place the Wooden Door Handle No 14 on the outside of door and use a 60mm screw from the inside to secure Pr...

Page 8: ...om the inside to secure Pre drill hole first to avoid splitting On the inside of the door opening fix the Ply Door Stop No 15 to the bottom left corner using 3x20mm screws Sandwich the Door Styrene No...

Reviews: