background image

P 4

Please retain product label and instructions for future reference

             

1!

2!

Pre drill 

hole

Step 1

Parts needed -              & 

 

To fix the Windows (

No. 21

) into the panels

that accomodate a window. First fix the 

Window Block to the Window as shown 

with 1x30mm screw.

Place the Window into the window hole 

and fix by screwing though the Window 

Block (

No. 19

) with 2x30mm screws as 

shown. 

Screw into the Window first.

18x30mm screws. 

30mm 

screw

Step 2

Parts needed -              &             &

 

Lay the Floor Joists 

(No. 7)

 under the 

floor OSB with an even space 

between each one. Position joists 

flush on one side of the Floor OSB 

(No. 6) 

and mark centers of joists onto 

either end . Fix using 4 x 30mm 

screws per joist.

Place the Veranda Boards 

(No. 8)

 

along the joists and against the floor 

sheet. Spread them evenly making 

sure the end board is flush with the 

framing. Fix using 2 x 30mm screw for 

each board along the dotted lines 

shown on the illustration.

50x30mm screws

 

30mm 

screw

6

8

7

Step 3

Parts needed -            &

 

Fix the corners with 50mm screws as 

shown in diagram.

Do not secure the building to the floor 

until the roof is fitted.

 

Position the Plain Gable 

(No. 4)

 and Left

Window Side (

No. 2

) so there is equal 

spacing between the floor and cladding 

on all 4 sides.

3x50mm screws

 

 

 

50mm 

screw

3

1

2

4

19

21

6

8

7

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

2

4

50mm 

screw

Step 4  

Parts needed -            &

Attach the remaining Right Window Side 

(

No. 3

) and Door Gable 

(No. 1)

 using the 

same method as shown previously.

Fix with 3x50mm screws at each corner.

9x50mm screws

 

 

 

1

3

1!

2!

Pre drill 

hole

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

Summary of Contents for Tulip Playhouse 02TUL411411-V4-PEFC

Page 1: ...asphalt or any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base...

Page 2: ...5mm Cover Trims 12x45x1155mm Fascia Board 12x95x980mm Roof Eave 28x28x1520mm FS2828 1500mm SR1295 1470mm FS2828 1155mm S1245 1155mm FAS980x95mm FS2828 1520mm QTY x2 QTY x2 QTY x4 QTY x3 QTY x5 18 15 F...

Page 3: ...2X203mm BEADING 9X12X247mm QTY x4 QTY x4 22 Window AI 02PHOW V1 QTY x3 20 21 Poppy Playhouse Door and Window Pack Tulip Playhouse Door and Window Pack Door AI 02TUL411411 V3D 20 Window AI 02PHOW V1 QT...

Page 4: ...8 along the joists and against the floor sheet Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screw for each board along the dotted lines shown on the illust...

Page 5: ...the roof ensuring they come together at the top using 40mm screws directly through the roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30m...

Page 6: ...here is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 60x Felt Tacks Felt tacks Step 10 Parts needed At the back of the building fix the two Cover Trims No 10 to either end...

Page 7: ...14x30mm screws 30mm screw Beading Beading 26 26 23 24 25 25 25 25 26 26 Step 15 Parts needed Place the Wooden Door Handle No 14 on the outside of door and use a 60mm screw from the inside to secure Pr...

Page 8: ...om the inside to secure Pre drill hole first to avoid splitting On the inside of the door opening fix the Ply Door Stop No 15 to the bottom left corner using 3x20mm screws Sandwich the Door Styrene No...

Reviews: