Step 5
Parts needed - &
Place the Ridge Bar
(No. 9)
in between
the door and plain gable. Ensure the top
corners of the support bar are flush with
each top point (see illustration).
Secure in place using a L bracket
(No. 17)
on each end and 4x30mm screws per brace.
8x30mm screws
30mm
screw
Step 6
Parts needed - &
Fix two eaves frames
(No. 12)
to each roof
OSB sheet using 3x30mm screws per eave.
Fix the Roof sheets
(No. 5)
to the roof
ensuring they come together at the top
using 40mm screws directly through the
roof sheet at the top. Make sure to attach
the roofs to the ridge bar.
6x30mm screws
24x40mm screws
40mm
screw
30mm
screw
Step 7
Parts needed -
Fit the Fascia Block
(No. 13)
to the front of
the building using 4x30mm screws, make
sure it is flush with the outside edge of each
roof sheet.
4x30mm screws
30mm
screw
17
17
9
5
5
12
17
9
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
12
5
13
Step 8
Parts needed - &
Once the roof (No.5) is fixed attach the
building to the floor (No.6) with 50 mm
screws making sure to screw into the Floor
bearers.
20x50mm screws
50mm
screw
5
6