background image

13

P 5

Please retain product label and instructions for future reference

             

Step 5

Parts needed -              & 

Place the Ridge Bar 

(No. 9)

 in between 

the door and plain gable. Ensure the top 

corners of the support bar are flush with 

each top point (see illustration). 

Secure in place using a L bracket 

(No. 17)

 

on each end and 4x30mm screws per brace.

8x30mm screws

 

 

 

30mm 

screw

Step 6

Parts needed -             &

Fix two eaves frames 

(No. 12)

 to each roof 

OSB sheet using 3x30mm screws per eave.

Fix the Roof sheets 

(No. 5)

 to the roof 

ensuring they come together at the top 

using 40mm screws directly through the 

roof sheet at the top. Make sure to attach 

the roofs to the ridge bar. 

6x30mm screws

24x40mm screws

 

 

 

40mm 

screw

30mm 

screw

Step 7

Parts needed -       

Fit the Fascia Block 

(No. 13)

 to the front of 

the building using 4x30mm screws, make 

sure it is flush with the outside edge of each 

roof sheet.

4x30mm screws

 

 

30mm 

screw

17

17

9

5

5

12

17

9

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

12

5

13

Step 8

Parts needed -              & 

Once the roof (No.5) is fixed attach the 

building to the floor (No.6) with 50 mm 

screws making sure to screw into the Floor 

bearers.

20x50mm screws

50mm 

screw

5

6

Summary of Contents for Tulip Playhouse 02TUL411411-V4-PEFC

Page 1: ...asphalt or any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base...

Page 2: ...5mm Cover Trims 12x45x1155mm Fascia Board 12x95x980mm Roof Eave 28x28x1520mm FS2828 1500mm SR1295 1470mm FS2828 1155mm S1245 1155mm FAS980x95mm FS2828 1520mm QTY x2 QTY x2 QTY x4 QTY x3 QTY x5 18 15 F...

Page 3: ...2X203mm BEADING 9X12X247mm QTY x4 QTY x4 22 Window AI 02PHOW V1 QTY x3 20 21 Poppy Playhouse Door and Window Pack Tulip Playhouse Door and Window Pack Door AI 02TUL411411 V3D 20 Window AI 02PHOW V1 QT...

Page 4: ...8 along the joists and against the floor sheet Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screw for each board along the dotted lines shown on the illust...

Page 5: ...the roof ensuring they come together at the top using 40mm screws directly through the roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30m...

Page 6: ...here is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 60x Felt Tacks Felt tacks Step 10 Parts needed At the back of the building fix the two Cover Trims No 10 to either end...

Page 7: ...14x30mm screws 30mm screw Beading Beading 26 26 23 24 25 25 25 25 26 26 Step 15 Parts needed Place the Wooden Door Handle No 14 on the outside of door and use a 60mm screw from the inside to secure Pr...

Page 8: ...om the inside to secure Pre drill hole first to avoid splitting On the inside of the door opening fix the Ply Door Stop No 15 to the bottom left corner using 3x20mm screws Sandwich the Door Styrene No...

Reviews: