background image

P 23

Please retain product label and instructions for future reference

             

IMPORTANT: 

Pre-drill before fixing screws.

Step 40

Parts needed - No. 70 QTY 1    

 

  

Place the floor boards (

No. 70

inside the building flush to the log 

boards on one side. 

Continue  adding the floor boards 

(

internally

) making sure to interlock 

each individual board.

*Do 

NOT

 secure the boards until 

the last board has been measured 

and cut.

Following the same method 

outlined previously measure the 

gap between the bottom of the 

tongue (

on the last  board placed

and the log board.

Using a straight edge mark out the  

measurement onto the last floor 

board (

No. 70

) and cut along the 

length removing the excess.

**Please note:

 Mark the final board 

2mm under the measurement; This 

will allow the timber to expand and 

contract correctly.

Once all the floor boards are in

position secure each board into 

position using 8x40mm screws per 

board.

***Please Note:

 

Ensure to screw  

through each of the floor boards into 

the floor bearers.

200x40mm Screws 

40mm 

screw

Pre drill 

hole

This is for illustrative purposes only and may differ from your floor.

70

70

IMPORTANT: 

Pre-drill before fixing screws.

Roof

Closure Trim

Internal

67

*Measure and cut the

closure trims to

fit the internal space.

Pre drill 

hole

30mm 

screw

*

trim to fit

Step 41

Parts needed - No. 67 QTY 7 

   

 

Inside the building place the closure 

trim (

No. 67

) against the boarding and 

align with the roof as shown in the 

illustration. 

*Measure and cut the closure trims to 

fit the internal space.

Once in position fix each trim  into 

place by pre drilling a pilot hole and 

using 6x30mm screws per trim, 

equally spacing them along the face 

of the board.

42x30mm Screws

IMPORTANT: 

Pre-drill before fixing screws.

*Internal view

67

67

30mm 

screw

Pre drill 

hole

*

Cut to fit

Step 42

Parts needed - No. 67 QTY 7

Once the floor has been laid arrange the

closure trim (

No. 67

) around the outside 

edge of floor (

internally

), measure and cut 

down accordingly to best match the 

internal space.

Secure each trim section into place using 

6x30mm spaced equally along the board 

as shown in the illustration.

*Do NOT fix the closure trim to the floor

boards.

42x30mm Screws

 

Summary of Contents for 0634CSNE0303HGDD2SW-V1

Page 1: ...where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm groun...

Page 2: ...Y 1 Morticed for lock AI 06LOGDGMD750X1900 V3 13 14 15 17 17a 17c 18 19 20 21 Secondary DoorQTY 1 AI 06LOGDGSD750X1900 V3 Door Frame Left Upright 71x70x2065mm QTY 1 AI 0634LOGDUFL V3 Door Frame Right...

Page 3: ...3000 Finisher Board 34x80x1945mm QTY 1 LB34RG80 J 1945 2x61 deg cut 1945mm finished Finisher Board 34x80x676mm QTY 1 LB34RG80 CGR 676 2x45 deg cut left 677mm finished Finisher Board 34x80x676mm QTY 1...

Page 4: ...63 Fascia 16x120x2225mm QTY 1 S16120 2225 Roof Board Pack B QTY 2 AI 06LOGC3X3RBP2 V2 Roof Board Pack C QTY 2 AI 06LOGC3X3RBP3 V2 73 64 Fascia 16x120x2000mm QTY 2 S16120 2000 65 66 Fascia 16x120x1658...

Page 5: ...x 12 70mm Screw x 39 80mm Bolt Set x 16 There may be extra screws present in the nail bag 80mm Screw x 24 Pre assembly Please note Each board interlocks at either end in a staggered pattern Before sec...

Page 6: ...r using 10x90mm screws ensuring the frame is flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrate making sure they are an equal measurement If the...

Page 7: ...wn in the illustration 5x70mm Screws 70mm screw IMPORTANT Pre drill before fixing screws a b 40 36 22 41 32 1st 2nd 3rd 5th 4th 36 22 Step 4 Parts needed No 25 QTY 1 Make the log cabin level by adding...

Page 8: ...lace the master and secondary doors No s 9 10 onto a flat surface and fix the Adjustable door hinge No 17c to the doors using 3x30mm screws per hinge Fix 3 x Adjustable Door Hinges No 17a b into posit...

Page 9: ...slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 6 Please note This image is for illustrative pu...

Page 10: ...be positioned on the inside of the building Pre drill hole 30mm screw Step 12 Parts Needed No 1 QTY 2 No 7 QTY 4 Position the window No 1 so that it sits centrally within the window frame Fix the fema...

Page 11: ...thod as shown in the illustration bringing the board level to the top of the window and door frames Please note when you get to the top of the boards the right hand boards will be slightly lower Ensur...

Page 12: ...ush with each other as you lay each one Rubber Mallet may be required to fit parts Step 18 Parts needed No 38 QTY 1 No 39 QTY 1 Lay the Finisher Boards No 38 39 onto the front of the log cabin to brin...

Page 13: ...n Fix into position by screwing through the notches as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one 2x120mm Screws Pre drill hole 120mm scre...

Page 14: ...crewing through the truss into the Purlin at an angle as shown in the illustration using 1x90mm screw per truss 3x90mm Screws Pre drill hole 90mm screw Rubber Mallet may be required to fit parts Pre d...

Page 15: ...fore fixing screws 48 48 48 Rubber Mallet may be required to fit parts Please note You can adjust the blocks attached to the roof truss if necessary IMPORTANT Pre drill before fixing screws Step 24 Pa...

Page 16: ...y 1 Roof Assembly 2 45 45 45 45 42mm 42mm Rubber Mallet may be required to fit parts 45 43 Step 26 Parts needed No 48 QTY 2 Locate the last two Roof Truss A No 48 into the 42mm gaps between the finish...

Page 17: ...ew Roof Assembly 1 Roof Assembly 2 IMPORTANT Pre drill before fixing screws 70mm screw 52 IMPORTANT Pre drill before fixing screws Step 28 Parts needed No 71 QTY 1 Pack A No 72 QTY 2 Pack B No 73 QTY...

Page 18: ...e 5 sides 84x40mm Screws Pre drill hole 40mm screw A B C B C 72 73 73 71 72 A B C B C 72 73 73 71 72 Roof Assembly 1 Roof Assembly 2 IMPORTANT Pre drill before fixing screws Step 30 Parts needed No 71...

Page 19: ...ch of the 5 sides 84x40mm Screws A B C B C 72 73 73 71 72 A B C B C 72 73 73 71 72 IMPORTANT Pre drill before fixing screws Roof Assembly 1 Roof Assembly 2 Pre drill hole Pre drill hole 40mm screw Ste...

Page 20: ...m screw Step 34 Parts Needed No 8 QTY 2 Fix the casement stay No 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm screws Ensure the casement stay is centralised on...

Page 21: ...nmongery Neverthe less the process of fixing the frames is the same Once components have been fitted try closing doors to ensure the doors can be closed and the lock works If your doors do need adjust...

Page 22: ...4 5 6 7 8 Felt sheet dimensions 1 1600mm L x 1000mm W 2 2303mm L x 1000mm W 3 1655mm L x 1000mm W 4 3141mm L x 1000mm W 5 1600mm L x 1000mm W 6 820mm L x 1000mm W 7 680mm L x 1000mm W 8 2180mm L x 10...

Page 23: ...bearers 200x40mm Screws 40mm screw Pre drill hole This is for illustrative purposes only and may differ from your floor 70 70 IMPORTANT Pre drill before fixing screws Roof Closure Trim Internal 67 Me...

Page 24: ...cut to size in the same way as previously stated 34x40mm Screws Pre drill hole 40mm screw 63 64 64 65 65 65 62 Pre drill hole 80mm bolt 66 66 Step 44 Parts needed No 66 QTY 8 Arrange the storm braces...

Page 25: ...indow frame fixing in place onto the framing above each window using 3x70mm screws per guard Attach the Rain Guard No 16 to the door frame fixing in place onto the framing above the Door using 3x70mm...