P 17
Please retain product label and instructions for future reference
Step 27
You can now fix the assembled roof
truss’s and Roof Purlin to the log
cabin, making sure the attached
blocks sit inside the assembly.
Some adjustment may be required
to ensure the roof structure rests
correctly.
Once in position fix the roof truss’ to
the log cabin using 1x120mm screw
per truss as shown in the diagram.
Ensure to stagger screws to avoid
colliding.
Secure the Roof Purlin to the log
cabin by screwing through the
purlin into the gable using 2x70mm
screws
10x120mm Screws
2x70mm Screws
Pre drill
hole
120mm
screw
Roof Assembly 1
Roof Assembly 2
IMPORTANT:
Pre-drill before fixing screws.
70mm
screw
52
IMPORTANT:
Pre-drill before fixing screws.
Step 28
Parts needed - No. 71 QTY 1 Pack A
No. 72 QTY 2 Pack B
No. 73 QTY 2 Pack C
*
HINT:
keep the roof board packs seperate to prevent mixing them up.
Place the first board from each ‘Roof Board Pack’
(A, B, & C )
onto the roof assembly, working around the
structure, building each layer of roof boards one by one.
Once you are happy with the fit of the roof boards, fix the boards into place using 2x40mm screws per board,
ensuring to fix through the roof board into the truss below.
28x40mm screws
Pre drill
hole
40mm
screw
A
B
C
B
C
73
73
71
72
72
Roof Assembly 1
Roof Assembly 2
A
73
72
72
71
73
B
B
C
C
Roof Assembly 1
Roof Assembly 2
A
B
C
B
C
72
73
73
71
72
A
72
73
73
71
72
B
B
C
C