P 10
Step 9
Parts Needed - No. 11 QTY 1
No. 12 QTY 1
No. 13 QTY 1
No. 14 QTY 1
For the Double Door frame, arrange the left,
right, top & bottom door frames
(No’s. 11, 12,
13 & 14)
onto a level surface.
Secure the top and bottom frames to the
uprights using 2x80mm screw per corner,
ensuring the screws do
NOT
protrude through
the front of the door framing.
8x80mm Screws
Pre drill
hole
80mm
screw
13
14
11
12
IMPORTANT :
Pre-drill before fixing screws.
The internal lip of the door
frame should be posItioned on
the inside of the building.
14
12
IMPORTANT :
Pre-drill before fixing screws.
79
77
76
79
77
78
Pre drill
hole
80mm
screw
Step 10
Parts Needed - No. 76 QTY 1
No. 77 QTY 1
No. 78 QTY 1
No. 79 QTY 1
For the Fully boarded single door frame,
arrange the left, right, top & bottom door
frames (
No’s. 76, 77, 78 & 79)
) onto a level
surface.
Secure the top and bottom frames to the
uprights using 2x80mm screw per corner,
ensuring the screws do
NOT
protrude through
the front of the door framing.
8x80mm Screws
The internal lip of the door
frame should be posItioned on
the inside of the building.
Please retain product label and instructions for future reference