P 6
Please retain product label and instructions for future reference
Pre drill
hole
70mm
screw
Step 3
Parts needed - No. 53 QTY 2
No. 91 QTY 2
Lay the bearers (
No. 53 & 91
) onto a
firm and level surface as shown in the
illustration.
Fix the bearers together at each
corner using 2x70mm screws,
ensuring the frame is flush.
Once fully assembled, ensure the
bearers are square by measuring from
corner to corner, as illustrated, making
sure they are an equal measurement.
If the bearers are not alligned equally,
unscrew, adjust and re-align
accordingly.
8x70mm Screws
Example picture
2 screws per bearer per end.
91
53
91
53
Step 4
Parts needed - No. 91 QTY 9
Arrange the remaining bearers
(No. 91)
inside the assembled frame.
*Ensure there is an equal amount of
space between each frame.
Secure each of the frames in place using
2x70mm screws for each end of each
bearer, ensuring the bearers remain
level.
Once fully assembled, ensure the
bearers are square by measuring from
corner to corner, as illustrated, making
sure they are an equal measurement.
If the bearers are not alligned equally,
unscrew, adjust and re-align
accordingly.
36x70mm Screws
91
91
91
91
91
91
91
91
91
91
Pre drill
hole
70mm
screw