![Summer Garden Buildings 085 Assembly Instructions Manual Download Page 1](http://html.mh-extra.com/html/summer-garden-buildings/085/085_assembly-instructions-manual_1391110001.webp)
10 x 20 SHED 085 ASSEMBLY INSTRUCTIONS
Preparation of base
We recommend that the base onto which your building will stand should be at least 75mm larger
in each direction than the total floor size of the building.
Actual floor area of the building: 2970x3038 mm
Total height clearance: 2168mm
The chosen position in your garden for the siting of the building should be excavated to a depth of
75mm to allow a base of sand, on to which paving slabs can be evenly laid - THEY MUST BE
LEVEL AND FIRM.
Tools required
●
Hammer
●
Step ladder
●
Sand paper
●
Battery-powered drill/screwdriver
●
8mm drill
●
Pencil
●
Tape measure
●
Gloves
●
Sharp knife and saw
Important Safety Information
PLEASE READ PRIOR TO ASSEMBLY OF THE BUILDING
EVERY PRECAUTION IS TAKEN TO ENSURE THAT YOUR BUILDING HAS NO ELEMENT
INCORRECTLY PLACED OR POSSIBLY HAZARDOUS, HOWEVER PRIOR TO USE PLEASE
CHECK ALL SURFACES FOR THE FOLLOWING:
1. RAISED GRAIN, SPLINTERS: sand down timber to smooth finish
2. NAIL/SCREW/PIN HEADS PROUD: tap home to be flush with surface of timber
3. DAMAGED SCREW HEADS RESULTING IN SHARP SPLINTERS OF METAL: replace
4. SHARP ENDS OF NAILS/ SCREWS/PINS PROTRUDING THROUGH THE PANEL: remove
and reposition.
5. ENSURE ALL PARTS ARE SECURED AGAINST REASONABLE FORCE: remove and refit
6. ENSURE THERE ARE NO LOOSE PARTS: remove and refit/discard
We recommend that protective gloves be worn throughout
Our Help Line provides support and advice to customers of Summer Garden
Buildings after ordering. For advice before you buy you can phone us free 7 days a
week on 0800 9777828 or visit www.summergardenbuildings.co.uk