P 23
Please retain product label and instructions for future reference
IMPORTANT:
Pre-drill before fixing screws.
Step 36
Parts needed - No. 71
No. 72
No. 73
No. 93
*
HINT:
keep the roof board packs seperate to prevent mixing them up.
Continue arranging the Roof Board Packs
(A, B, C & D)
onto the roof assembly, working around the struc-
ture, building each layer of roof boards one by one.
Ensure the roof boards are not laid too close together, use the spacers
(No.69)
provided to create a 2mm
gap. Adjusting the spacing between the boards allows the wood to swell in damp weather.
Once you are happy with the fit of the roof boards, fix the 2nd, 3rd & 4th boards into place using 40mm
screws ensuring the screws fix through the roof board into the truss below.
Repeat this so you have 4 boards screwed down in total on each of the 7 sections.
120x40mm Screws
Pre drill
hole
40mm
screw
72
73
73
71
72
A
B
C
C
71
71
D
D
B
Left Handed
Right Handed
71
A
B
C
C
93
93
D
D
B
73
72
72
73
Step 37
Parts needed - No. 71
No. 72
No. 73
No. 93
*
HINT:
keep the roof board packs seperate to prevent mixing them up.
Continue arranging the roof board packs
(A, B, C & D)
onto the roof assembly, working around the structure,
building each layer of roof boards one by one.
Ensure the roof boards are not laid too close together, use the spacers
(No.69)
provided to create a 2mm gap.
Adjusting the spacing between the boards allows the wood to swell in damp weather.
Once you are happy with the fit of the roof boards, fix the 5th, 6th & 7th boards into place using 40mm screws,
ensuring the screws fix through the roof board into the truss below.
Repeat this so you have 7 boards high screwed down in total on each of the 7 sections.
120x40mm Screws
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
40mm
screw
A
B
C
C
D
D
B
Left Handed
Right Handed
A
B
C
C
D
D
B
71
93
93
73
72
72
73
72
73
73
71
72
71
71