background image

Overlap Pent Wall Shed

6' x 3'' 

Important : 

Assembly of this 

shed requires a 

minimum of two 

adults.

Issue 0115

B

OPW63PP

PLAIN PANEL 

QTY 3

OW63LHA

LEFT SIDE APEX

E

A

OPP63 PARTS LIST

BRDFL36

FLOOR

SDRPT

DOOR 

OPW3DP

DOOR END 

28281629PT

1629mm BATTEN QTY 1

H

M

 I

44161944PTR

1944mm STRIP QTY 3

L

2

4

1

1

C

OPW63TP

TALL PLAIN PANEL

QTY 2

J

3

44161690PTR

1690mm STRIP QTY 3

 J

Must Pre-drill for 
each screw used.

37281784PT

1784mm BATTEN QTY 2

 O

FELT 

85052 Qty 1

Place the panels on top of the floor. Make sure that all of the panels are tight and flush 
before fixing them to each other using 3x50mm screws.

Make sure that the panels are sitting flush before fixing to the floor using 2 x 50mm 
screws for each panel. Make sure that all of the screws are positioned so that they screw  
into the bearers underneath.

G

59121100PPT

1100mm STRIP QTY 2

N

D

A

B

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

This building is pressure treated to ensure longevity of all 
timber components and to protect against rot. This may leave 
a colour difference on some parts that will even out as the 
moisture content stabilises. This will not need additional 
treatment.

- This product must be built on a solid level base.
- This product must be built on a solid level base.
- Timber is a natural material. It will shrink and swell as a 
result of varying moisture content.
- Due to the nature of the material the doors may need some 
trimming for a neater fit.
- Please keep all plastic bags and small parts away from 
children
- The roof of this building is not a load bearing structure.

Technical Helpline:

 0333 7777 089

  8.30 am and 5.00 

pm  Monday to Friday.

Please check all parts prior to assembly

Assembly of damaged parts may be deemed to be 
acceptance and this may affect the remedies you are entitled 
to.
 If the product is not constructed in accordance with the 
instructions, or is altered in any way (e.g. painted), the 
manufacturer cannot be held liable for any resulting damage.

 

28280673PT

673mm BATTEN QTY 1

 K

45280673PT

673mm BATTEN QTY 1

H

178411008

ROOF SHEET

QTY 1

 

OW63RHA

RIGHT SIDE APEX

F

 

A

B

A

C

A

K

A

D

A

G

A

H

A

J

A

J

A

 I

A

 I

A

 I

Place the two apex sections on top of the structure  as shown, making sure again that everything is flush and lined 
up correctly before fixing each to the top of the panel and 670mm batten using 2 x 50mm screws. Using another 
50mm screw secure the side of each apex section to the back panel.

Place the corner strips so that they cover the joins between 
the panels. Fix each in place using 3 x 30mm screws

REQUIRED TOOLS : 
(NOT SUPPLIED)

POZI DRIVE

 SCREWDRIVER

SPIRIT LEVEL

TAPE MEASURE

HAMMER

Fixing Pack (OPW63FP)

This fixing pack is used for several products. 
There may be additional fixings.

Not to Scale

L Bracket

 Qty 2

50mm Screw Qty 37

30mm Nail Qty 32

25mm Screw Qty 35

Hasp & 

Staple

30mm Screw Qty 18

10mm Felt tacks

 Qty 60

SHARP KNIFE

40mm Screw Qty 6

Flush Hinge 

Qty 2

Fix the 28x28x670mm batten to the floor in between the back panel and the door panel. Make sure that it is flush with th front and 
secure it in place using 2x50mm screws making sure that the screws are in lien with the floor bearers underneath. 

Place the 1629mm batten on top of the batten you have just fixed and tight against the door panels framework as shown. Fix this in 
place using 3x50mm screws. 

Fix an L bracket at each end of both the 45x28x670mm batten using 2 x 25mm screws. Place the batten so that it is in line with the top 
of the door front and flush with the framing. Secure this in place fixing the other half of the L’ brackets. again using 25mm screws.

A

L

A

O

Reviews: