background image

 8’ x 6’ Overlap Reverse Apex 

Shed

Fixing Pack (OPA68FP)

This fixing pack is used for several products. 
There may be additional fixings.

Not to Scale

Important : 

Assembly of this 

shed requires a 

minimum of two 

adults.

MUST PRE-DRILL

Issue 0115

FELT 

B

ODR6PE

PLAIN END QTY 2

ODR8FP

FRONT PANEL 

ODA8BP

PLAIN SIDE 

236510708

ROOF BOARD QTY 2 

FELT78BL QTY 1

C

D

E

G

F

37282275

2275mm BATTEN QTY 4

A

ODR86 PARTS LIST

1

4

SFL46

 FLOOR 

QTY 2 

SDRDT

DOOR QTY 1 

37282365

2365mm BATTEN QTY 2

44161798DT

1798mm  CORNER STRIP QTY 4

H

 J

 K

L

 I

Top View

2

B

B

Z’ bracket Qty 8

30mm Screw Qty 19

50mm Screw Qty 26

25mm Screw Qty 27

10mm Felt tacks Qty 100

Ridge Plate

30mm Nail Qty 82

PCWIN1

WINDOW

59121110PAII62DT

1110mm ANGLED BARGE BOARD QTY 4

20121695PDT

20 x 1695mm STRIP QTY 1

M

84996

675mm PLASTIC STRIP QTY 4

N

Fix both of the floors together using 2x50mm 
screws, screwing through the floor bearers 
as shown.

Place the panels on top of the completed floor. Make sure that all the panels are 
tight and flush before fixing them to each other using 3x50mm screws.

When the panels are secured to each other, make sure they are square and fix 
them to the floor using 3x50mm screws for each panel. Make sure that the screws 
are positioned so that they locate into the bearers underneath.

Fix the 20 x 1695mm strip to the side 
of the door frame so that it is tight 
with the cladding and flush with the 
frame. Use 3 x 30mm screws.

3

Flush Hinge 

Qty 2

Hasp & 

Staple

D

5

Place the corner strips so that they cover the joins between 
the panels. Fix each in place using 3x30mm screws.

40mm Screw Qty 12

 

25mm Security Screws

Screws Qty 12

REQUIRED TOOLS : 
(NOT SUPPLIED)

POZI DRIVE 

SCREWDRIVER

TAPE MEASURE

HAMMER

SHARP KNIFE

FLAT HEAD 

SCREWDRIVER

SCISSORS

B

E

M

C

M

L

M

L

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

This building is pre-treated with a factory base coat for 
protection during storage and transit. We recommend that 
you treat your new building as soon as possible after 
assembly using a wood preservative treatment. Apply in 
accordance with the manufacturers instructions.

- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a 
result of varying moisture content.
- Due to the nature of the material the doors may need some 
trimming for a neater fit.
- Please keep all plastic bags and small parts away from 
children

Technical Helpline:

 0333 7777 089

  8.30 am and 5.00 

pm  Monday to Friday.

Please check all parts prior to assembly

Assembly of damaged parts may be deemed to be 
acceptance and this may affect the remedies you are entitled 
to. 
If the product is not constructed in accordance with the 
instructions, or is altered in any way (e.g. painted), the 
manufacturer cannot be held liable for any resulting damage.

Place the hinge against the inside of the door frame and position the large section 
of the hinge so that it is flush with the inside of the framing as shown. Fix with 
25mm screws.

Open the hinge and fix the smaller section to the door framing. Again make sure 
that the hinge is flush and that the holes are positioned so that the 25mm screws 
locate correctly into the batten.

 

H

FIN20010512DT  

QTY 2

Reviews: