8’ x 6’ Overlap Reverse Apex
Shed
Fixing Pack (OPA68FP)
This fixing pack is used for several products.
There may be additional fixings.
Not to Scale
Important :
Assembly of this
shed requires a
minimum of two
adults.
MUST PRE-DRILL
Issue 0115
FELT
B
ODR6PE
PLAIN END QTY 2
ODR8FP
FRONT PANEL
ODA8BP
PLAIN SIDE
236510708
ROOF BOARD QTY 2
FELT78BL QTY 1
C
D
E
G
F
37282275
2275mm BATTEN QTY 4
A
ODR86 PARTS LIST
1
4
SFL46
FLOOR
QTY 2
SDRDT
DOOR QTY 1
37282365
2365mm BATTEN QTY 2
44161798DT
1798mm CORNER STRIP QTY 4
H
J
K
L
I
Top View
2
B
B
Z’ bracket Qty 8
30mm Screw Qty 19
50mm Screw Qty 26
25mm Screw Qty 27
10mm Felt tacks Qty 100
Ridge Plate
30mm Nail Qty 82
PCWIN1
WINDOW
59121110PAII62DT
1110mm ANGLED BARGE BOARD QTY 4
20121695PDT
20 x 1695mm STRIP QTY 1
M
84996
675mm PLASTIC STRIP QTY 4
N
Fix both of the floors together using 2x50mm
screws, screwing through the floor bearers
as shown.
Place the panels on top of the completed floor. Make sure that all the panels are
tight and flush before fixing them to each other using 3x50mm screws.
When the panels are secured to each other, make sure they are square and fix
them to the floor using 3x50mm screws for each panel. Make sure that the screws
are positioned so that they locate into the bearers underneath.
Fix the 20 x 1695mm strip to the side
of the door frame so that it is tight
with the cladding and flush with the
frame. Use 3 x 30mm screws.
3
Flush Hinge
Qty 2
Hasp &
Staple
D
5
Place the corner strips so that they cover the joins between
the panels. Fix each in place using 3x30mm screws.
40mm Screw Qty 12
25mm Security Screws
Screws Qty 12
REQUIRED TOOLS :
(NOT SUPPLIED)
POZI DRIVE
SCREWDRIVER
TAPE MEASURE
HAMMER
SHARP KNIFE
FLAT HEAD
SCREWDRIVER
SCISSORS
B
E
M
C
M
L
M
L
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This building is pre-treated with a factory base coat for
protection during storage and transit. We recommend that
you treat your new building as soon as possible after
assembly using a wood preservative treatment. Apply in
accordance with the manufacturers instructions.
- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
Technical Helpline:
0333 7777 089
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in any way (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
Place the hinge against the inside of the door frame and position the large section
of the hinge so that it is flush with the inside of the framing as shown. Fix with
25mm screws.
Open the hinge and fix the smaller section to the door framing. Again make sure
that the hinge is flush and that the holes are positioned so that the 25mm screws
locate correctly into the batten.
H
FIN20010512DT
QTY 2