Pre drill
hole
70mm
screw
P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
Step 1
Parts needed - No. 16 QTY 2
No. 17 QTY 2
Lay the bearers (
No’s. 16 & 17
)
onto a firm and level surface
(
free from areas where
standing water can collect
) as
shown in the illustration.
Fix the framing together at each
corner using 8x70mm screws,
ensuring the frame is flush.
8x70mm Screws
17
17
16
16
Pre drill
hole
70mm
screw
Step 2
Parts needed - No. 17 QTY 12
Following the same method
outlined in the previous step,
range the remaining bearers (
No.
17
) as shown in the illustration.
*Ensure there is an equal amount
of space between each frame.
Secure each of the frames in place
using 2x70mm screws for each
side of the bearer, ensuring the
framing remains level.
48x70mm Screws
17
16
17
*Before beginning assembly decide which side
you would like to place the storage section.
Depending on your preference ensure to align
the 5th floor bearer with the partition wall.
17
17
17
17
17
17
17
17
17
17
17
17
Pre drill
hole
70mm
screw
Step 3
(See Pre-Assembly)
Parts Needed - No. 5 QTY 2
No. 9 QTY 3
Place the Starter Boards (
No. 5)
and the
Log Boards
(No. 9
) on
to assembled base frame along
the longest sides.
*Ensure the notches at either
end of each board are flush
and level with the ends of the
frame.
Fix each of the starter boards to
the frame by screwing through
the notch into the frame as
shown in the illustration.
6x70mm Screws
9
9
9
5
5
IMPORTANT:
Pre-drill before fixing screws.
Step 4
(See Pre-Assembly)
Parts needed- No. 6 QTY 6
No. 7 QTY6
No. 8 QTY 6
No. 9 QTY 10
No. 11 QTY 6
No. 12 QTY 6
Following the same method
outlined in
Pre-Assembly
, lay
the first 6 Log Boards (
No’s. 6,
7, 8, 9, 11 & 12
) onto the
starter boards to create your
first level.
*Ensure that the boards are
level and flush with each
other as you lay each one.
Please Note:
The short boards at the
front and side of the building (either
side of the door and window opening’s)
can be placed either side depending
on your needs.
12
9
9
7
6
8
11
IMPORTANT :
Pre-drill before fixing screws.
IMPORTANT :
Pre-drill before fixing screws.
5
Example picture
2 screws per bearer per end