P 7
Please retain product label and instructions for future reference
Pre drill
hole
Step 11
Parts needed - No. 18 QTY 2
Align the Purlin(
s
) (
No. 18
) into
the cut out slots on each gable top
ensuring each perlin interlocks the
boards.
Secure the purlins at each end
by screwing through the bars into the
boards using 6x70mm screws per
purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in product.
Nevertheless, despite any differences
the process of fixing the Purlins
is the same.
12x70mm Screws
70mm
screw
Step 10
(See Pre-Assembly)
Parts needed - No. 4.1A QTY 2
No. 4.1B QTY 2
No. 4.2A QTY 1
No. 4.2B QTY 1
No. 8 QTY 1
Following the same method,
add the next boards of the
gables (
No. 4.1b & 4.2b)
onto
the panels as shown in the
diagram. Secure the boards in
place using 2x70mm screws per
board.
Place the final log board
(No. 8)
onto the front of the assembly
and screw down with 2x70mm
screws.
Then add the final boards of the
gables (
No. 4.1a & 4.2a)
onto
the panels as shown in the
diagram. Secure the boards in
place using 2x70mm screws per
board.
*Ensure that the boards are
level and flush with each other
as you lay each one.
14x70mm Screws
Pre drill
hole
70mm
screw
18
18
IMPORTANT:
Pre-drill before fixing screws.
4
.1b
4
.1a
4
.1b
4
.1a
4
.2b
4
.2a
IMPORTANT:
Pre-drill before fixing screws.
8
a
b
a
b