It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
P 11
Please retain product label and instructions for future reference
Step 19
Parts needed - No. 21 QTY 1
No. 22 QTY 2
Secure the fascia’s (
No’s. 21 & 22
) to
the front and sides of building using
3x30mm screws. At the front ensure
to align the Front Fascia (
No. 21
) to
the fascia blocks. With each Side
Fascia (
No. 22
), align with the roof
purlins and eaves frame.
Ensure to screw through the fascias
into the blocks and strips placed.
9x30mm Screws
Pre drill
hole
30mm
screw
22
21
22
Step 20
Parts needed - No. 23 QTY 8
Arrange the storm braces
(No. 23)
around the building
(internally)
.
Place 2x storm braces per side
fixing into place using 2x70mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***It is important that each
bolt is tightened using a
washer so as not to damage
the log boards.
16x70mm Bolt Sets
Pre drill
hole
70mm
bolt
23
23