P 11
Please retain product label and instructions for future reference
Pre drill
hole
70mm
screw
23
23
Step 16
Parts Needed - No. 23 QTY 2
Once the gables are in position
place the Finisher Boards (
No. 23
)
onto the front and rear of the
building, fixing into position by
screwing through the notches as
shown in the illustration.
*Ensure that the boards are level
and flush with each other as you
lay each one.
4x70mm Screws
Rubber Mallet
may be required
to fit parts.
IMPORTANT :
Pre-drill before fixing screws.
26
26
a
IMPORTANT:
Pre-drill before fixing screws.
26
26
Pre drill
hole
70mm
screw
Step 17
Parts needed - No. 26 QTY 3
Align the Roof Purlin(
s
)
(
No.26
) into the cut out slots on each
gable top ensuring each roof purlin
interlocks the boards.
Secure the roof purlins at
each end by screwing through the
bars into the boards (
ensure to
pre-drill to avoid the boards
splitting
) using 4x70mm screws per
roof purlins.
*Please note:
The gable shown is for
illustrative purposes and may differ in
width from your choice in product.
Nevertheless, despite any differences
the process of fixing the roof purlins is
the same.
12x70mm Screws
a
b
Rubber Mallet
may be required
to fit parts.
26
b