Please retain product label and instructions for future reference

             

Pre-assembly

*Please note:

Each board interlocks at either end in a staggered pattern.

Before securing ensure that the boards are fitted properly in their respective

tongues and grooves.

Step 1

Parts Needed - No. 31 QTY 2

                                 No. 30 QTY 2

Lay the bearers (

No’s. 31 & 30

) onto a 

firm and level surface (

free from 

areas where standing water can 

collect

) as shown in the illustration.

Fix the bearers together at each  

corner screwing 2 screws per corner 

using 8x70mm screws, ensuring the 

bearer is flush.

Once fully assembled, ensure the 

bearers are square by measuring 

from corner to corner as illustrated, 

making sure the measurements are 

equal.

If the bearers are not aligned equally, 

unscrew, adjust and re-align 

accordingly. 

8x70mm Screws 

31

30

31

Pre drill 

hole

70mm 

screw

30

=

=

IMPORTANT: 

Pre-drill before fixing screws.

Pre drill 

hole

70mm 

screw

Step 2

Parts Needed - No. 31 QTY 8

Following the same method 

arrange the remaining bearers 

(

No.31

) inside the assembled 

frame.

*Ensure there is an equal 

amount of space between each 

frame.

Secure each of the frames in 

place using 2x70mm screws for 

each side of the bearer, ensuring 

the bearers remain level.

32x70mm Screws 

31

31

31

31

31

31

31

31

31

30

31

IMPORTANT: 

Pre-drill before fixing screws.

Summary of Contents for 0619RANE3503FGSD3TW-V1

Page 1: ...n as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Log Cabins Are supplied untreated and require a preservativ...

Page 2: ...w Frame Right Upright 71x70x2065mm QTY 3 AI 0619LOGDUFR V3 Window Frame Top 81x125x808mm QTY 3 AI 0619LOGTWTF V3 Window Frame Bottom 71x70x688mm QTY 3 AI 0619LOGTWBF V3 Window Contents 7 8 9 Fully Gla...

Page 3: ...0 1X14 ANGLE CUT Fascia 120x12x3532mm QTY 2 S12120 3532 Gable Window Notch 2996mm QTY 1 AI 0619RANE3503FGSD3TW GW Gable 2996mm QTY 1 AI 0619RANE3503FGSD3TW G Main Building Contents 30 31 32 33 Bearer...

Page 4: ...rer is flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not aligned equally unscrew...

Page 5: ...nto the frame as shown in the illustration 4x70mm Screws 24 20 22 25 Step 4 Parts Needed No 20 QTY 6 No 22 QTY 6 No 24 QTY 6 No 25 QTY 6 Following the method shown in the illustration lay the first 6...

Page 6: ...rough the front of the window framing Using the method outlined above assemble three window frames 24x80mm Screws Pre drill hole 80mm screw 5 3 The internal lip of the window frame should be postioned...

Page 7: ...window frame should be postioned on the inside of the building 11 9 Step 8 Parts Needed No 21 QTY 18 Once you have laid 6 boards off of the starter on the front corner locate one of the assembled wind...

Page 8: ...e securing it in place Ensure that the boards are level and flush with each other as you lay each one a b a b 21 21 Step 10 Parts Needed No 20 QTY 6 No 25 QTY 6 Once you have positioned the door frame...

Page 9: ...mes please refer to steps 5 6 Please note This image is for illustrative purposes and may differ from your choice in product regarding door window position Nevertheless the process of fitting the door...

Page 10: ...to fit parts Step 14 Parts Needed No 22 QTY 1 No 36 QTY 1 Following the method shown in the illustration remaining log boards No 22 36 onto the front and back of the log cabin Ensure that the boards...

Page 11: ...re fixing screws 26 26 a IMPORTANT Pre drill before fixing screws 26 26 Pre drill hole 70mm screw Step 17 Parts needed No 26 QTY 3 Align the Roof Purlin s No 26 into the cut out slots on each gable to...

Page 12: ...top of the apex and leave an overhang at the bottom The last board on each side will overhang past the end of the roof purlin Using a straight edge and a pencil mark out a line as a guide Cut along t...

Page 13: ...crews IMPORTANT Pre drill before fixing screws Pre drill hole 30mm screw Step 21 Parts Needed No 14 QTY 1 No 15 QTY 1 No 16 QTY 1 Fit the Mortice Lock No 15 into the recess in the glazed door No 1 and...

Page 14: ...w through eachof the floor boards into the floor bearers 248x40mm Screws Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space Closure Trim Internal 35 Measure and cut t...

Page 15: ...t each side Once the felt is laid out fix to the roof using felt tacks at 100mm intervals Felt size 3624mm X 1000mm 190x Felt Tacks Step 26 Parts Needed No 6 QTY 3 No 12 QTY 1 Attach the Rain Guards N...

Page 16: ...braces No 34 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building En...

Page 17: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back SILIC O N E SEA LA N T It is ESSENTIAL...