Please retain product label and instructions for future reference
Step 27
Parts Needed - No. 28 QTY 4
No. 29 QTY 2
Align the fascia’s (
No. 28 & 29
)
with the roof and fix into place
using 3x40mm screws per
fascia, making sure to screw
through the fascia into the roof
purlins and eaves frame.
*Ensure the angled cuts meet
at the top of the apex.
18x40mm Screws
Pre drill
hole
40mm
screw
28
29
28
29
28
28
29
IMPORTANT:
Pre-drill before fixing screws.
P 16
Pre drill
hole
60mm
bolt
34
34
Step 28
Parts needed - No. 34 QTY 8
Arrange the storm braces (
No. 34
) around
the building (
internally
). Place 2x storm
braces per side fixing into place using 2x
60mm bolts per brace making sure the
washer & nut are tightened from the
outside of the building.
*Ensure the storm braces are secured at
the highest pointpossible on each side.
The storm braces will need to be altered
during the builings life as the moisture
content within te log boards changes. The
boards will expand during periods of high
moisture (winter) and shrink during
periods of low moisture (summer).
**Storm braces will help your building
expand and contract properly.
***Important: Ensure each bolt is
tightened using a washer so as not to
damage the log boards.
16x60mm Bolt Sets
IMPORTANT:
Pre-drill before fixing screws.