Pre drill
hole
30mm
screw
IMPORTANT:
Pre-drill before fixing screws.
Step 21
Parts Needed- No.18 QTY 4
- No.26 QTY 2
Fix the Fascia
(No. 18)
to each end
of the roof, securing with 3x30mm
screws per Fascia. Ensure the
screws go through the roof fram-
ing
Fix the Diamond Finials
(No.26)
to
the Fascias using 2x30mm screws
per finial.
10x30mm Screws.
18
26
18
18
18
26
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
P15
Please retain product label and instructions for future reference
Step 20b
Parts Needed- No.35 QTY 4
Place the Veranda
(No.35)
at the front of the
building, flush to the front of the building
.
Secure using 4x50mm Screws at an angle
into the front of the building.
4x50mm screws.
Pre drill
hole
50mm
screw
35
Step 21b
Parts Needed- No.36 QTY 2
Fix the Rails
(No.36)
to the building using
2x40mm screws per railing, ensuring to go
through to the Cover trim on the front of the
building. Using 4x40mm screws, fix the rails
to the veranda floor
8x40mm screws.
Pre drill
hole
40mm
screw
36
36
VERANDA PACK
Summary of Contents for 03DTSHAX0608FGD4MW-V1
Page 18: ...2 1 3 4...
Page 19: ...1 2...