Please retain product label and instructions for future reference
P 8
IMPORTANT:
Pre-drill before fixing screws.
8x8 Summer House
10x8 Summer House
2ft EXTENSION PACK
a
Pre drill
hole
50mm
screw
IMPORTANT:
Pre-drill before fixing screws.
Step 5
Parts Needed- No.7 QTY 2
Place the Front Window panel
(No.7)
onto the
floor, fix the corners using 3x50mm screws
Do not secure the building to the floor
until the roof has been fitted.
Position the panels so there is equal
spacing between the floor and cladding on
all sides.
The Front panels should sit lower than the Side
panels
6x50mm Screws
7
a
a
a
a
a
a
7
a
a
a
a
a
a
a
a
a
a
a
a
7
7
7
7
Pre drill
hole
40mm
screw
12
Step 6
Parts Needed- No.12 QTY 1
Place the Door Framing
(No.12)
onto the
floor, between the Front Window Panels.
Ensure the framing is flush to the Window
Panel framing.
Ensure that the panels are all equally
spaced to the floor before fixing the door
framing.
Secure the Door framing to the floor using
3x40mm screws
3x40mm Screws
Pre drill
hole
50mm
screw
11
IMPORTANT:
Pre-drill before fixing screws.
Step 7
Parts Needed- No.10 QTY 1
- No.11 QTY 1
Place the Plain Gable Top
(No.10)
on top of
the Back panels. Fix using 6x50mm screws
in an alternating pattern, going through
the gable framing and into the panel
framing below.
Place the Door gable top
(No.11)
on top of
the Front Window Panel. Fix using 4x50mm
screws
Ensure Cladding is fitted correctly and
flush to the panels before securing.
10x50mm Screws
10
Summary of Contents for 03DTSHAX0608FGD4MW-V1
Page 18: ...2 1 3 4...
Page 19: ...1 2...