
IMPORTANT:
Pre-drill before fixing screws.
P 7
Please retain product label and instructions for future reference
8x8 Summer House
10x8 Summer House
2ft EXTENSION PACK
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
1
1
1
1
1
1
Pre drill
hole
50mm
screw
a
Step 4
Parts Needed- No.1 QTY 2
Place the Side Window panels
(No.1)
onto
the floor. Fix in an alternating pattern using
3x50mm screws per panel.
Do not secure the building to the floor
until the roof has been fitted.
Position the panels so there is equal
spacing between the floor and cladding on
all sides.
6x50mm Screws
a
a
a
a
a
a
Pre drill
hole
50mm
screw
2ft EXTENSION PACK
10x8 SUMMER HOUSE ONLY
Step 4a
Parts Needed- No.31 QTY 2
Place the Plain panels Extensions
(No.31)
onto
the floor. Fix in an alternating pattern using
3x50mm screws per panel.
Do not secure the building to the floor until
the roof has been fitted.
Position the panels so there is equal spacing
between the floor and cladding on all sides.
6x50mm Screws
Please note: The side panels are all
interchangeable and can be positioned in
a variety of configurations. Decide which
works best before assembly
Please note: The side panels are all
interchangeable and can be positioned in
a variety of configurations. Decide which
works best before assembly
31
31
Summary of Contents for 03DTSHAX0608FGD4MW-V1
Page 18: ...2 1 3 4...
Page 19: ...1 2...