
Please retain product label and instructions for future reference
P12
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
20mm
screw
21
21
Step 13
Parts Needed- No.21 QTY 2
- No.17 QTY 1
Fix a Ring Pull
(No. 21)
to the front
of each door using 4x20mm black
screws per ring pull.
Fix the Door Cover trim
(No.17)
to
the bottom of the door opening,
secure to the framing piece using
3x30mm screws, ensuring the top of
the cover trim is flush with the
framing
8x20mm black screws.
3x30mm screws
20
20
Step 15
Parts Needed- No.20 QTY 1
Fix the Press lock
(No.20)
to the
back (internally) of the Master door
(No. 9)
with 4x20mm black screws.
Making sure to align the key holes.
4x20mm Black screws.
Pre drill
hole
20mm
screw
Step 14
Parts Needed- No.15 QTY 1
- No.16 QTY 2
On the inside of the building fix the Door
Frame Strips
(No.15 and No.16)
, to the
top and sides of the doors frames. Make
sure that the edges are flush with the
edge of the framing. Fix with 4x30mm
screws per strip.
12x30mm Screws
Pre drill
hole
30mm
screw
15
16
16
15
16
21
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
30mm
screw
Step 12
Parts Needed- No.8 QTY 1
- No.9 QTY 1
- No.22 QTY 6
Fix 3 Hinges
(No. 22)
to each Door
(No.8 and No.9)
securing with
4x30mm black screws per hinge.
Position as shown.
Fix each Door to the building with
4x30mm black screws per hinge.
Ensure the doors open and close
freely.
48x30mm Black screws.
22
9
8
17
Internal View
Internal View
Summary of Contents for 03DTSHAX0608FGD4MW-V1
Page 18: ...2 1 3 4...
Page 19: ...1 2...