Step 23
Parts needed - & & &
Place a Window Frame Cross
(
No. 37
) against the inside of each
window. Position the frame centrally to
the window and fix using 4x20mm
screws per frame.
Locate the Wooden Door Handle
(
No. 34
) onto the outside of the door.
Fix in place by hand, screwing through
the door with the screw attached to the
door handle.
Fix the Door Stop (
No. 33
) to the
inside of the Door Panel at the top and
bottom using 3x20mm screws as shown
per door stop.
Fix the Butterfly (
No. 38
) onto to
the door using 4x10mm screws.
4x10mm Screws
18x20mm Screws
20mm
screw
10mm
screw
A
B
C
D
A
B
C
D
33
34
38
37
1!
2!
Pre drill
hole
38
33
34
37
33
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Playhouse Maintenance:
It is recommended that the following checks and maintenance are carried out at the beginning
of each season as well as at regular intervals during the usage season.
- Check all nuts /bolts/ screws for tightness and tighten when required.
- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.
- Check hinges.
- Replace defective parts in accordance with the manufacturers instructions.
- Check any crossbeams, suspensions and anchors.
- If a swing is included; check the swing seat, chains and ropes.
IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD
www.merciagardenproducts.co.uk P14
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.