background image

MR-526 Components and Parts List   

No   

Product name   

Specification   

Material    Quantity   

1   

Electronic meter    JS-10327 outgoing line 120MM, two heartbeat outgoing line 

100MM   

 

1   

2   

Hand-held heartbeat 

sheet   

Flexible rubber   

 

2   

3   

Handle weld   

25   

FE   

1   

4   

Cup head self-tapping 

screw   

M4*20   

BK   

2   

5   

Semi-round end cover   

25   

PP   

2   

6   

Foam   

25*3T*500mml   

HDR   

2   

7   

End cover   

50*32 upper swing pipe with a small top ring   

PP   

2   

8   

Foam   

32*3t*570MML upper swing pipe   

HDR   

2   

9R   

Upper swing right  

32*1.5T*752MML   

FE   

1   

9L   

Upper swing left  

32*1.5T*752MML   

FE   

1   

10   

Umbrella-head 

inner-hexagon screw   

M8*20 Nylonpatch 360°, 5MM handle 2 + central axis 2 + 

crank spindle 2   

Plating black   

6   

11   

Spring washer   

8 pedal spindle 2 + central axis 2 + handlebar 6   

Plating black   

10   

12   

Spring washer   

8*36*3 central axis   

Plating black   

2   

13   

Nylon bush   

18.8*38 outer ring without groove   

PA+MnS2   

4   

14   

Curved washer   

8*19*1.5T upper swing pipe 4+ handlebar 6+ handle 2    Plating black   

12   

15   

Umbrella-head 

inner-hexagon screw    M8*20 5mm Upper swing with hexagon hole 4 + handlebar 6  Plating black   

10   

16   

Spring washer   

19.5* 

  38*0.5   

BK   

2   

17   

Big flat head screw   

M5*12   

BK   

4   

18   

Line clamping plug   

12 Hardness 55-60 degree   

PVC   

1   

19   

Nylon bush A   

19*38 outer ring with groove   

PA+MnS2   

2   

20   

Heartbeat line   

650MM   

 

2   

21   

Central axis   

18. 8*354. 2MML extrusion tap on both sides M8*25   

UCP   

1   

22   

Umbrella-head 

inner-hexagon screw   

M10*78 part-thread lower swing pipe type A 5-leg hexagon 

hole   

Plating black   

2   

23   

Lower swing casing 

pipe   

14*59   

UCP   

2   

24   

Bush   

32*14   

PA+MnS2   

4   

25L    Lowe swing weld left   

32*1.5T*580MML   

FE   

1   

25R    Lower swing welding 

right   

32*1.5T*580MML   

FE   

1   

26   

Spring washer   

10*19*2 lower swing pipe   

Plating black   

2   

27   

Nylon nut   

M10 lower swing pipe   

Plating black   

2   

28   

Bottle holder   

TC-F01   

Black   

1   

29    Big head thread cutting 

screws   

M5*15 Bottle holder   

Electrophoresis 

black   

2   

30   

Handlebar pipe weld   

60*1.5T*985MML    cut 51°   

FE   

1   

31   

Upper line   

1100MML   

 

1   

32   

Fine tuning lower 

section   

Lower section of 1300mm outgoing line 34MM straight pipe 

screw   

 

1   

33   

Elliptical tube plug   

30*60 pedal tube   

PP   

2   

34L   

Pedal welding left   

30*60*1.5T*780MML Ellipse   

FE   

1   

34R   

Pedal welding right   

30*60*1.5T*780MML Ellipse   

FE   

1   

35   

Carriage bolts   

M6*50 pedal plate   

Plating black   

4   

36L   

Pedal left   

8001 All Black   

PP   

1   

36R   

Pedal right   

8001 All Black   

PP   

1   

37   

Spring washer   

6*14*2 pedal plate   

Plating black   

4   

38   

Spring washer   

  6   

Plating black   

4   

39   

Small round flower 

rotary knob   

M6 internal thread   

ABS   

4   

40   

Spring washer   

8*24*2 pedal mandrel   

Plating black   

2   

 

5

Summary of Contents for MR-526

Page 1: ...TICAL TRAINER INSTRUCTION MANUAL Email service merach com O cial Website www merach com Company Zhejiang Yulu Electronic Technology Co Ltd Address 298 Weiye Road Binjiang District Hangzhou Zhejiang Pr...

Page 2: ...MR 526 ELLIPTICAL TRAINER INSTRUCTION MANUAL...

Page 3: ...e note and follow the enclosed safety and assembly instructions carefully If you have questions please do not hesitate to contact us Support email service merach com Safety Instruction 2 3 Exploded Dr...

Page 4: ...d every 1 2 months that all connecting elements are tight fitting and are in the correct condition Replace defective components immediately and or keep the equipment out of use until repair For repair...

Page 5: ...CESSIVE TRAINING CAN CAUSE HEALTH INJURIES Please follow the advice for correct training as detailed in training instructions The load work level can be adjusted by turning the adjustment knob on the...

Page 6: ...0 18 41 89 90 91L 92 74 75 76 58 57 56 86 88 87 85 84 32 31 30 Item 99 2 Item 100 1 28 29 44R 45 42 43 46 20 48 49 50 53 64 65 67 68 69 70 63 71 72 73 77 78 79 80 81 82 83 91R 95 94 60 61 62 47 55 51...

Page 7: ...ness 55 60 degree PVC 1 19 Nylon bush A 19 38 outer ring with groove PA MnS2 2 20 Heartbeat line 650MM 2 21 Central axis 18 8 354 2MML extrusion tap on both sides M8 25 UCP 1 22 Umbrella head inner he...

Page 8: ...20 5 L black surface double bearings PB3851 1 62 Compression wheel arbor 10 42mml BK 1 63 Magnet 40 25 10MM Indication S N 10 64 Nut M6 opposite side 10 ucp 2 65 Double thread screw 6 80 denticulate...

Page 9: ...es Black 1 94 Ornament cover of front pipe KS 8007 ABS 1 95 Self tapping screw M4 5 25 BK 6 96 Fine tuning upper section The upper section is 540mm and the outgoing line is 30MM 1 97 Round head screw...

Page 10: ...ine with carriage screws 88 Screwing with an Allen wrench 99 Step 2 1 Firstly inserting the front pipe ornament cover 94 into the handlebar stand pipe 30 and then the connecting line 31 is connected w...

Page 11: ...ssembled 34R 25R on the handlebar stand pipe 30 firstly installing the position shown in the figure below then successively penetrating into the lower swing 25R with the central shaft 21 after that pu...

Page 12: ...rear end of the pedal tube 34R into the U shaped opening of the M piece 44R and then successively penetrating into the corresponding hole position with the inner hexagon screws 42 after that screwing...

Page 13: ...ossom knob 39 spring washer 38 and spring washer 37 on the screw pump 35 and tightening them up The other side can be installed as above Step 7 Locking the screws 15 the cushions 11 and the washers 14...

Page 14: ...position of the handlebar stand pipe 30 and fixing it with the line clamping plug 18 3 Removing the fixed screws 17 on the back of the electronic meter 1 in advance connecting the upper flat cable 31...

Page 15: ...13 Now your machine is ready to use Note Make sure all the screws are tightened before using...

Page 16: ...fat percentage Window A display 1 It measures the instantaneous speed showing the speed of movement and the measurement range is 0 0 99 9 km h 2 Revolutions per minute RPM measures the pedal speed sho...

Page 17: ...n the dashboard in front of the fitness equipment with silk 3 Installing the magnet base and the sensor at the designated positions of the fitness equipment and keeping parallel with the distance betw...

Page 18: ...sing m DYFAT key to enter the lipid measurement parameter setting state first setting the individual NO At this time the corresponding No value flashes pressing RECOVERY UP key DOWN key to select the...

Page 19: ...ncluded in the scope of free maintenance 2 If the goods need to be repaired this card and purchase certi cate should be attached to the designated repair center for repair 3 Maintenance fee will be ch...

Reviews: