85-03-01120
M27
Page
42
Gas Pressure Requirements and Checking
Two pressure taps for checking input and output gas pressures are located on the main gas valve. A qualified installer should
use this fitting for setting the correct gas pressure during initial installation.
The appliance and its appliance main gas
valve must be disconnected from the gas
supply piping system during any pressure
testing of that system at test pressures in
excess of 1/2 psi (3.5 kPa).
The appliance must be isolated from the gas
supply piping system by closing its equipment
shut-off valve during any pressure testing of
the gas supply piping system at test pressures
equal to or less than 1/2 psi (3.5 kPa).
Drip Leg Requirement
A drip leg/ sediment trap must be installed within the
main gas supply line serving this appliance.
Figure 3-30 Drip Leg/ Sediment Trap
Manual Gas Shutoff Valve Requirement
If local building codes require one, obtain an external keyed wall-mounted or
floor-mounted manual gas shutoff valve approved per local gas plumbing codes
and install per local gas plumbing codes in the specified location. Local
requirements supersede all other codes.
Figure 3-29 Main Gas Valve
Figure 3-31 Keyed Manual Gas Shutoff
Valve
Summary of Contents for CHELSEA M-27
Page 2: ...85 03 01120 M27 Page 2 HOMEOWNER NOTES ...
Page 16: ...85 03 01120 M27 Page 16 Figure 3 8 Figure 3 7 ...
Page 35: ...85 03 01120 M27 Page 35 Approved Vent Systems ...
Page 62: ...85 03 01120 M27 Page 62 ...
Page 64: ...85 03 01120 M27 Page 64 ...
Page 65: ...85 03 01120 M27 Page 65 VERTICAL THROUGH THE ROOF VENTING USING THREE 900 ELBOWS ...
Page 69: ...85 03 01120 M27 Page 69 ...
Page 70: ...85 03 01120 M27 Page 70 ...
Page 71: ...85 03 01120 M27 Page 71 ...
Page 72: ...85 03 01120 M27 Page 72 ...
Page 73: ...85 03 01120 M27 Page 73 ...
Page 74: ...85 03 01120 M27 Page 74 ...
Page 103: ......