Page 38
Ttan Boom
TM
60-S - Operator’s Manual
September 2020
Secton 8 - Machne Inspectons
Using The Maintenance Chock
NEVER perform work or inspection on the machine with the platform
elevated without first blocking the boom assembly with the Maintenance
Chock�����
The Maintenance Chock is heavy����� Hold it securely during the installation
and removal process����� The Maintenance Chock may rotate around the
cylinder rod during machine movement and may fall if it is not held
securely in place during installation and removal�����
When performing inspection, maintenance, or repair on a machine
elevated out of the stowed condition any load must be removed from
the platform; the safety chock shall be installed during any of the
aforementioned activities�����
The Maintenance Chock fits over the lift cylinder rod, between the rod end and the end of the cylinder
barrel.
Installation
Remove the Maintenance Chock from the tool storage compartment of the Engine Module (See
Component Locations on page 15).
Using the Boom Lift/Lower function, raise the platform to approximately 13 feet (4 m).
Place the Maintenance Chock over the cylinder rod above the cylinder barrel.
Using the Boom Lift/Lower function, slowly lower the boom until the Maintenance Chock is
secure between the cylinder rod end and the cylinder barrel.
Removal
Using the Boom Lift/Lower function, raise the platform to approximately 13 feet (4 m) until the
Maintenance Chock moves freely.
Remove the Maintenance Chock from the cylinder rod.
Store the Maintenance Chock in the tool storage compartment of the Engine Module.
ART_3475
Proper Placement
Of Maintenance
Chock
Maintenance
Chock
Cylinder
Rod
•
•
•
•
•
•
•