![background image](http://html1.mh-extra.com/html/mec/titan-boom-60-s/titan-boom-60-s_operators-manual_1758607021.webp)
Page 17
Ttan Boom
TM
60-S - Operator’s Manual
September 2020
Operating Instructions & Function Tests
DO NOT operate this machine until you have read and understood this manual, have
performed the Workplace Inspection, Pre-Start Inspection and Routine Maintenance, and have
completed all the test operations detailed in the Operating Instructions section�����
This section provides instructions and tests for each function of machine operation. Follow all safety
rules and instructions. The operator must conduct inspections and a Functions Test of the machine
before each work shift to check that all machine systems are working properly.
Test the machine on a firm level surface with no debris, drop-offs, potholes or overhead obstructions.
Perform each step outlined in this section.
This machine shall only be operated by trained and authorized personnel. If multiple operators use
this machine, all must be trained, qualified and authorized to use it. New operators must perform a
Pre-Start Inspection and Functions Test prior to operating the machine.
Operators must comply with all employer and job site rules and governmental regulations regarding
the use of personal protective equipment – see Fall Protection on page 3.
DO NOT use a machine that is malfunctioning. If any function does not perform as described, tag the
machine and remove for repair by a qualified service technician. After repairs are completed, a Pre-
Start Inspection and Functions Test must be performed before using the machine.
Prestart
ART_3353
Perform Prestart Inspection (see page 39).
Check Emergency Stop Switches at both the base and platform controls – turn
clockwise to reset.
ART_2356
Check Battery Disconnect Switch outside the front end of the Engine Module.
Must be in ON position.
Starting Engine from Base Controls
ART_3345
Be sure that the upper and lower EMERGENCY STOP Switches are reset.
Lower Control Box:
Turn Key Switch to CHASSIS.
Operating Instructions & Function Tests
Secton 7 - Operatng Instructons & Functon Tests