17
11. Open the drain cock to discharge all the
compressed air and water in the air tank.
If you found any abnormalities in the check-
up or inspection prior to the operation, send
the machine to your dealer or authorized
service facility for inspection or repair.
Operating Procedure
Before operating the machine, be sure to carry
out the "Inspection and checkup prior to opera-
tion" described on page 15.
1. Fully open the drain cock and turn the
power switch on. The buzzer will sound
with a beep at the same time.
•
For buzzer sounding patterns, see
page 21.
After the operation has started, close the
drain cock tight to increase the pressure.
2. After confirming the operation has
stopped due to the increased pressure,
turn the adjustment handle of the pres-
sure-reduction valve to adjust the operat-
ing pressure of the nailer and pneumatic
tool to the appropriate level. When ad-
justing the pressure, turn the pressure-
reduction valve's adjustment handle
counterclockwise to set the pressure at a
level lower than the appropriate value by
2 bars once. Then proceed to the adjust-
ment while increasing the pressure by
turning the handle clockwise.
•
Make sure to start the adjustment at a level
lower than the appropriate pressure and
continue the adjustment while increasing
the pressure from that level upward. If you
start the adjustment from a level higher
than the appropriate value, an error results
between the pressure gauge value and ac-
tually used pressure. (Due to Characteris-
tics of pressure-reduction valve
respectively)
•
2 pressure-reduction valves provided on
this machine allow you to connect MAX
and the general-purpose nailer or
pneumatic tool.
<Pressure-reduction valve H> Allows
connection and use of MAX PowerLite
tools (of operating pressure of 24.5 bars
maximum)
<Pressure-reduction valve L> Allows con-
nection and use of the general-purpose
nailers or pneumatic tools (of operating
pressure of 8.3 bars maximum)
AKHL1230E_UK.fm 17 ページ 2008年12月10日 水曜日 午後6時4分