Single Phase EV Charger Protection unit
12 |
P a g e
Connect the supply cable from the distribution board (or meter tails) directly to the RCBO ‘Incoming Supply’
terminals.
Connect the outgoing cable to the contactor L, E & N terminals.
If required, connect the CT to the 3 pin connector on the PCB
Check ALL power and earth connections before switching on.
THIS PRODUCT IS DESIGNED FOR AN ISOLATED EARTHING ARRANGEMENT. CHECK
BEFORE USING SWA CABLE