![Matt:e IP-EVCP-M Installation Manual Download Page 9](http://html1.mh-extra.com/html/matt-e/ip-evcp-m/ip-evcp-m_installation-manual_1742015009.webp)
Single Phase EV Charger Protection unit
9 |
P a g e
Connect the supply cable from the distribution board directly to the MCB ‘Incoming Supply’ terminals.
Connect the outgoing cable to the contactor L, E & N terminals.
If required, connect the CT to the 3 pin connector on the PCB
Check ALL power and earth connections before switching on.
THIS PRODUCT IS DESIGNED FOR AN ISOLATED EARTHING ARRANGEMENT. CHECK
BEFORE USING SWA CABLE