background image

1

All Rights Reserved, 2018

888-820-3508

Scan the QR code above to link to current document or click the link below:

  www.pactechsol.com

www.pactechsol.com

/ATTVendor

  

PTS90

1

2

3

 Series

 

120

V

 AC Power Distribution 

Panel

 

60A

 Main Breaker

with External Rotary Disconnect Switch

S

uitable for Use as S

ervice Equipment 

Small Cell, Pico, Micro, CRAN or Macro

INSTALLATION GUIDE 

Compact 

120

V

 

AC Power Distribution Load Center 

6

0AMP 

M

ain Breaker 

with External Rotary Disconnect Switch

Single SPD (L-

G

) per Leg or 

Dual

 SPD (L

-

N

)

 per Leg

, (N-

PE)

PTS90

1

2

3

 - 

Maximum 6

 UL489 Breaker Positions

 with Single SPD

 

PTS90

123

 - Maximum 5 UL489 Breaker Positions with Dual SPD

Summary of Contents for PTS90123 Series

Page 1: ...ain Breaker with External Rotary Disconnect Switch Suitable for Use as Service Equipment Small Cell Pico Micro CRAN or Macro INSTALLATION GUIDE Compact 120V AC Power Distribution Load Center 60AMP Mai...

Page 2: ...1 Steps to Inspect and Remove 9 4 0 Mounting 9 4 1 Mounting Bracket 9 4 2 Mounting to Pole Stanchion or Round Surfaces 10 Figure 3 Mounting Example 11 4 3 Mounting to flat surfaces 11 Figure 4 Mounti...

Page 3: ...C Power Distribution Load Centers provides a custom factory fully assembled load center for Small Cell and CRAN deployments PTS90123 Small Cell AC Power Distribution Load Center Figure 1 PTS90123 The...

Page 4: ...Installation shall be completed per all NEC and Local Codes Do not install PTS90123 Systems before reading and understanding all specifications and installation guides provided Installation should be...

Page 5: ...awg Cu Al Rated Conditional Short 10kAIC SPD Dual MOV L N N G 20Ka 8 20us Nominal External Ground Connection 2 hole 20 w 5 8 spacing Physical Housing Material Powder Coated Aluminum Breaker Access Thu...

Page 6: ...er 12 AMP PT KM1N 16A UL489A DIN rail Breaker 16 AMP Torque Recommendations Main QOU Breaker 42 47 in lbs Load Breaker 17 22 in lbs Surge Protection 17 22 in lbs Neutral Block and Bar 24 27 in lbs Gro...

Page 7: ...reading and understanding all specifications and installation guides provided Installation should be performed by a qualified installer www pactechsol com www pactechsol com ATTVendor Drawing above s...

Page 8: ...sub tending branch panel when modernizing or expanding existing sites 2 0 Features The PTS90123 Series of Small Cell AC Load Centers packaged as a custom configuration ready for install in new and exp...

Page 9: ...ding and understanding all specifications and installation guides provided Installation should be performed by a qualified installer 4 0 Mounting The PTS90123 Systems are certified for outdoor install...

Page 10: ...ocation for mounting 4 2 2 Install Pole Straps and tighten per specifications or 4 2 3 Mark and drill anchors locations using template provided 4 2 4 Wood Poles should be Lag Bolted or Through Bolted...

Page 11: ...ing enclosure on flat surfaces 4 3 1 Customer is responsible to identify suitable location for mounting 4 3 2 Mark and drill anchors or clips to secure enclosure to surface 4 3 3 Torque to mounting ha...

Page 12: ...ction Points 5 1 4 Review Neutral Connection points 5 2 Wiring Ground Connections 5 2 1 Ensure enclosure is grounded as per NEC and Local Jurisdictions Code requirements 5 2 2 If Using for Service Equ...

Page 13: ...al ground bar 5 3 3 Wire the Service Neutral to Neutral bar connection according to use and Local Jurisdictional Code 5 3 4 If wiring for Service Entrance ensure that the provided bond strap is connec...

Page 14: ...6 Standard Wiring Practice Example Caution Installation shall be completed per all NEC and Local Codes Do not install PTS90123 Systems before reading and understanding all specifications and installa...

Page 15: ...Front Access Plate set screw and tighten 5 4 3 Check to ensure all breakers are sitting square in the dead plate opening 5 4 4 Check to ensure all blank breaker positions are covered Caution Installa...

Page 16: ...ems before reading and understanding all specifications and installation guides provided Installation should be performed by a qualified installer 5 5 1 If installed as Service Equipment apply the SER...

Page 17: ...on verifying that all is in accordance with this document NEC and local Codes Caution Installation shall be completed per all NEC and Local Codes Do not install PTS90123 Systems before reading and und...

Page 18: ...ooleen Date 06 05 2018 File Location www pactechsol com Revision Control Issue Number 10 Date 09 05 2018 Description PTS90123Series Installation Guide Prime Contact 1 Name UID Phone Department Respons...

Reviews: