
35
7.10 Ecb (ElEctRoNic bRaKE) REplacEMENt
cHaptER 7: paRt REplacEMENt gUiDE
1) Remove the front shrouds as outlined in Section 7.1.
2) Disconnect the ECB wire harness (Figure A).
3) Remove the 2 nuts holding the ECB to the ECB mounting bracket (Figure B).
4) Disconnect the 2 tension eye bolts from the ECB mounting bracket (Figure C).
5) Remove the 4 screws holding down the ECB (Figure D). When reinstalling the ECB frame, torque the screws to 12 N-m.
figURE a
figURE b
figURE c
figURE D
Summary of Contents for E1X
Page 1: ...E 1 X E l l i p t i c a l S E R V IC E M A N U A l ...
Page 2: ......
Page 5: ...1 1 1 Serial Number Location Chapter 1 Serial number location ...
Page 18: ...14 Chapter 6 TROUBLESHOOTING 6 1 Electrical Diagrams Electrical Block Diagram ...
Page 19: ...15 Wiring diagram INstruction 6 1 Electrical Diagrams Chapter 6 Troubleshooting ...
Page 20: ...16 Chapter 6 TROUBLESHOOTING P01 Console Cable 6 1 Electrical Diagrams ...
Page 21: ...17 6 1 Electrical diagrams Chapter 6 Troubleshooting P02 Pulse sensor wire ...
Page 22: ...18 6 1 Electrical Diagrams P03 Generator Wire Chapter 6 Troubleshooting ...
Page 70: ...66 NOTES ...