![Mastip METICOM TM10 User Manual Download Page 3](http://html1.mh-extra.com/html/mastip/meticom-tm10/meticom-tm10_user-manual_1739178003.webp)
Page | - 3 -
© Copyright Mastip Technology Limited. Information subject to alteration. V3.51a www.mastip.com
Temperature Controller
METICOM TM10 Module
MAINFRAME
1. GENERAL DESCRIPTION
This controller is designed as a closed-loop power distribution and temperature controlling system. It
provides the user with premier temperature control capabilities.
This unit has one or more heavy duty connectors (rated 10A or16A) on back, used to connect with the
mold by mold-power & thermocouple cables.
This unit has one or more built-in cooling fans, one or two circuit breakers and power input cable. Neon
indicators illuminate after power on.
Heavy Duty Connector
Power Input Cable
2. UNPACKING & INSPECTION
1) After unpacking, inspect your mainframe and check for any damage that has occurred during shipment.
2) Check the circuit breaker and neon phase voltage indicators for damage.
3) Check for proper operation of circuit breaker by flipping breaker on and off with no voltage applied.
4) Check power output connector and thermocouple input connector for any physical damage.
5) Check AC input power configuration. The power input diagram is located on the back panel of the
mainframe. This diagram indicates the input voltage configuration that was prewired at the factory.
Make sure it matches what you ordered.
3. INSTALLATION
1) You are installing a piece of electronic equipment which is delicate and should not be subjected to any
physical or environmental abuse. Select a cool, dry, well ventilated, environmentally clean location,
away from heat, moisture and liquid carrying lines, i.e.: water cooling hoses, hydraulic hoses, etc.
2) Unless customized, all controllers will be configured for a power supply with single-phase 3-wire
208~240Vac for 1~2 zones controller, and either 3-phase 5-wire 380~415Vac or 3-phase 4-wire
200-240Vac for 3~48 zones controller.
Please follow the power supply configuration on the back panel.
If the configuration of power supply needs to be re-wired, please follow the back panel wiring diagram
in this manual.
3) Route AC input cable to a branch circuit (service) disconnect switch and attach leads to fused side of
switch. Be sure ground lead is attached to a good earth ground.
4) Connect power & thermocouple cables to mainframe and mold.
WARNING: Before applying power, make sure all international and local electrical codes have been followed
and all safety precautions are taken.
IMPORTANT: For mold wiring and heater connection information, refer to mold connector wiring diagram.