3
Figure 2
2. The control valve's drain connection is 1/2" npt and is located on
the back of the control valve.
3. Turn the control valve upside down and ensure that the control
valve o'rings are in place. Use silicone lubricant on the o'rings.
4. Place the control valve onto the distributor pipe.
5. Thread the control valve hand tight to 20 foot pounds!
DO NOT OVERTIGHTEN!
**DO NOT USE PETROLEUM!**
**USE ONLY SILICONE **
Service and Drain Piping:
1. Pipe water softener into the service lines .The inlet and outlet
connections of the control valve are 3/4” copper or pvc and are
located on the back of the valve body. As you face the timer the
inlet is on the left and the outlet is on the right. Always follow
local plumbing codes when installing our water treatment
equipment.
2. If sweat fittings are used, be sure soldering is done in such a
manner as not to allow heat to reach the control valve or bypass.
(If Schedule 80 PVC is used make sure to follow the proper
primer and solvent instructions.)
3. The drain line connection is located on the back of the valve as
you face the timer. It is recommended you install a 1/2” union on
the drain line for servicing. The drain line must be of adequate
size to allow for full regeneration flow.