© Martin Engineering GmbH
13
M3504UK-10/15
Installation
5.2
Installation procedure
5.2.1
Determining the installation position
Determining the position of the mainframe and the tensioner of the
MARTIN
®
QC
™
#1 primary cleaner must be done on both sides of
the chute wall. In the process, those positions are determined where
the mainframe of the MARTIN
®
XHD QC
™
#1 primary cleaner pass-
es through the chute wall or where the tensioner is installed on the
chute wall.
The MARTIN
®
XHD QC
™
#1 primary cleaner is operated along with
a tensioner. This is disassembled at the factory before delivery and
is reassembled during the installation along with the primary clean-
er.
The installation of the MARTIN
®
XHD QC
™
#1 primary cleaner and
the spring tensioner is described in this manual and the installation
manual of the tensioner.
There follows an overview of the installation steps:
There may be different local conditions that require different working
steps, which are shown below:
Installation on an encapsulated delivery system
• Carry out the instructions given in section 5.2.2 onwards.
Installation on an encapsulated delivery system with existing instal-
lation openings and brackets for belt cleaners.
• Carry out the instructions given in section 5.2.3 onwards.
Installation on an open delivery system
• Use the local resources to ensure that the dimensions for
the installation are correctly maintained.
1. Before starting with the work of installing the conveyor belt sys-
tem, switch off all accessories and secure them against being
switched on again inadvertently.
No.
Installation step
Instruction
1
Installing the scraper
M3504
2
Installing the tensioner
Tensioner
3
Tensioning the scraper
Tensioner
Tab. 1: Installation steps