background image

LC Plus

LED Video Display

Panel

Installation and Safety

Manual

TM

Summary of Contents for LC PLUS

Page 1: ...LC Plus LED Video Display Panel Installation and Safety Manual TM...

Page 2: ...ss consequential or economic loss or any other loss occasioned by the use of inability to use or reliance on the information contained in this manual The Martin logo the Martin name and all other trad...

Page 3: ...d fault earth fault protection Connect LC Plus panels to AC power using only 16 A rated industrial Type B power plugs and socket outlets that comply with IEC 60309 or a comparable national standard an...

Page 4: ...any other method of attachment than those described in this manual When stacking panels on top of each other fasten panels securely to prevent them from tipping or falling and do not stack more than...

Page 5: ...9 Flying from a truss bar or other structure 10 AC power 12 Power and fuses 12 Power connection 13 P3 communication link 16 Planning the P3 link 16 Connecting the P3 link 18 Configuration and testing...

Page 6: ...ol panel and LED display See Using the control panel and control panel display on page 19 for details D Power input connector Used to supply power to the panel Accepts an Amphenol IP67 rated power inp...

Page 7: ...henol IP67 rated ruggedized threaded locking power connectors Prolyte CCS6 conical coupler system for fast installation For the latest firmware updates documentation and other information about this a...

Page 8: ...andard Martin LC Series Important Do not throw away the protective shock absorbing materials from the flightcase when you unpack panels The protective materials will be needed when panels are repacked...

Page 9: ...end lift or attach panels Do not use the ventilation holes in the top rail or the LED tubes as attachment points Warning Secure every panel with two safety cables that are approved for the weight they...

Page 10: ...suspended in an upright position and when suspended on their sides An unlimited number of curtains of panels may be installed alongside each other To fly panels from a rig or other structure 1 Check t...

Page 11: ...r the panel above so that if a rigging clamp or conical connector fails the weight of the panels will be held by the vertical columns and the blocks the columns are anchored in and not by the panel ba...

Page 12: ...easily accessible so that power to the LC Plus can easily be shut down or disconnected if necessary Important Connect the panels in the installation and the P3 controller to AC mains power at the same...

Page 13: ...nt power cables with Amphenol connectors installed are available from your Martin supplier The supplied power cables can be replaced with cables from other sources but replacement cables must be 3 con...

Page 14: ...trands at the end of each conductor to strengthen them 5 Fasten the conductors in the cable into the screw terminals in the male or female contact insert as follows When installing an Amphenol C016 se...

Page 15: ...309 or a comparable national standard and is rated 16 A minimum and use corresponding power outlet sockets Follow the plug and socket manufacturer s instructions and all locally applicable laws and el...

Page 16: ...utput can be used as a video source P3 link requirements in large installations A single P3 100 system controller can drive up to 400 LC Plus 2140 panels up to 800 LC Plus 1140 panels or any combinati...

Page 17: ...agram of P3 system connections DVI Analog video Analog video Monitor Mouse Keyboard P3 100 System Controller P3 signal 1GB Ethernet switch required 1GB Ethernet switch required 100 m Max 50 panels per...

Page 18: ...s not matter which port you use as both P3 connectors can be used for input and output In outdoor or wet locations an IP67 rated Amphenol RJF RB 6 housing must be installed on the RJ 45 plug 2 Continu...

Page 19: ...Plus panel is powered on The control panel is used as follows To enter the control menus see Table 5 hold MENU pressed in for one second The red status LED at the bottom right of the panel will flash...

Page 20: ...ation Action required Blue Constant Busy e g booting up or writing to flash memory Wait a moment for normal operation to be resumed Red Constant Error The panel has encountered a fatal error and can n...

Page 21: ...the original factory programmed firmware Note that performing a factory reboot will only cause the panel to boot the factory firmware once At the next power cycle or reset a normal reboot will be car...

Page 22: ...r and overall brightness over many thousands of hours of use The extent of wear and tear depends heavily on operating conditions and environment so it is impossible to specify precisely whether and to...

Page 23: ...evice tested and serviced All panels and or monitor screen display video incorrectly or do not display video at all Incorrect video input or panel settings on P3 100 System Controller Check settings P...

Page 24: ...00 processor Gamma curve selection and adjustment Yes integrated in P3 100 processor Real time panel content remapping Yes integrated in P3 100 processor P3 Signal Protocol Signal type Gigabit Etherne...

Page 25: ...ts made at nominal voltage with all LEDs at full intensity Allow for a deviation of 10 Thermal Cooling Convection Maximum ambient temperature Ta max 50 duty cycle full white 1 sec on 1 sec off 40 C 10...

Page 26: ...conical coupler floor mounting option with hole for spigot length 44 mm P N 21021152 Half conical coupler floor mounting option with hole for spigot length 63 mm P N 21021153 Half conical coupler flo...

Page 27: ......

Page 28: ...www martin com Olof Palmes All 18 8200 Aarhus N Denmark Tel 45 8740 0000 Fax 45 8740 0010...

Reviews: