On the far side of chute:
a) If bolting fixed point bracket to chute wall, do the following:
(1) Position fixed point bracket on far side chute wall as shown in Figure 5.
Align bolt hole on bracket with head pulley center line.
(2) Mark bracket hole locations.
(3) Drill or cut two 12.7mm (1/2-in.) holes for screws in far side chute wall.
(4) Mount fixed point bracket to inside of far side chute wall using countersunk
screws and nuts.
b) If welding fixed point bracket to chute wall, do the following:
(1) Position fixed point bracket on far side chute wall as shown in Figure 5.
Align bolt hole on bracket with head pulley center line.
(2) Weld bracket to chute wall. Weld completely around bracket. Do not skip
weld.
Figure 6: Installing Fixed Point Bracket
c) Install brackets (C) using nuts (B). Hand tighten nuts.
d) Attach cleaner to far side bracket by inserting hex head screw and large
flat washer (C) through cable eyelet (D) and fastening with flat washer
and nut (E). Hand tighten nuts.
D
C
E
F
A. Bracket
B. Nut (2 used)
C. Allen Head Screw and Large Flat
Washer (2 used)
D. Cable Eyelet (2 used)
E. Flat Washer and Nut (2 used)
B