Installation
9
4. Tighten the screws and check that the luminaire is totally secure.
5. See Figure 3. Holding the second luminaire approximately in position,
push the wires from the first luminaire through the entry hole in the end of
the second luminaire and into the second luminaire’s housing.
6. Allowing 5 mm of clearance between the two luminaires as shown in
Figure 1, fasten the second luminaire by means of the captive nuts and
mounting screws.
7. Continue fastening luminaires, following the plan supplied with the
products.
Concealed cable entry
Power and control cables
can be routed inside
support posts, etc. for
concealed entry to
luminaires. Luminaires
that have this type of cable
entry must be drilled on
site during installation, and
a Thorsman membrane
nipple must be installed for
cable feed-through.
Membrane nipples must
be ordered at the same
time as Rail Lights but are
supplied free of charge for
Rail Light installations.
To drill the required holes:
Figure 3: Luminaire-to-luminaire connection
Max 250mm
Ø25
Ø36
A
Figure 4: Drilling extra cable holes