background image

• 

Locate  the  connector  labeled 

EXT

-

VLV

” 

and  connect  it  to  the  extraction  side  of  the  direc-

tional valve as shown in the picture. Secure the connector to the valve using the center bolt 

provided in the small plastic bag attached to the planter harness . 

 

 

Continue with the power harness.

 

 

• 

Locate the connector labeled 

POWER

” 

and connect it to its mated connector on the planters 

harness.

 

• 

Connect the two ring wire

-

ends (Labeled RT

-

1 and RT

-

2) of the power harness to 12 Volts 

power supply on your tractor. Make sure that the red wire (RT

-

1) is connected to switch

-

on 

positive  and  the  black  wire  (RT

-

2)  is  connected  to  negative.  Incorrect  connecting  of  the 

power wires can damage the electronics components.

 

• 

Close the box cover.

 

• 

Secure  the  harnesses,  converter  box,  and  ORIOLE  controller  box  to  the  planter  using  the 
provided zip ties.

 

 
 

Directional valve retraction

 

connector

 

 

Directional valve extraction 

connector

 

Tee connection fitting

 

Directional valve

 

• 

If you ordered the double valve plumbing box with additional airbag valve(SC

-

ASSEMBLY

-

2), 

locate the connector labeled 

PRES

-

REG BANK

-

2

” 

and connect it to the bank

-

2 pressure reg-

ulator  in  the  box.  The  bank

-

2  pressure  regulator  is  the  one  closer  to  the  air  inlets/outlets 

and doesn

t have a tee connection fitting. Secure the connector to the valve using the center 

bolt provided in the small plastic bag attached to the planter harness . 

 

 

• 

Locate  the  connector  labeled 

RET

-

VLV

” 

and  connect  it  to  retraction  side  of  the  directional 

valve as shown  in the picture. Secure the connector to the valve using the  center bolt pro-
vided in the small plastic bag attached to the planter harness. 

 

13 

Summary of Contents for SmartClean

Page 1: ...Martin Industries LLC 206 Elk Fork Road Elkton KY 42220 Telephone 270 265 5817 E Mail martin martintill com www martintill com VERSION 05 02 19 Installation Instructions ...

Page 2: ...ng box overview 3 2 Plumbing box installation 4 Tubing 4 1 From plumbing box to air cylinders 4 2 Inside the pluming box Standard factory plumbing 4 3 Plumbing box retubing for Bi Directional Control 5 Wiring 6 Smart Clean app 6 1 Download the App 6 2 Connect to your Martin Till SmartClean 6 3 Configure your Martin Till SmartClean 6 4 Single Valve Bank No Air Bag 6 5 Single Valve Bank Air Bag 6 6 ...

Page 3: ...BLY 2 3 Top and bottom cylinder brackets Specific to your order 4 Hardware kit 5 Pneumatic lines and fitting kits 6 VIair heavy duty Compressor SC AC 12V 7 Compressor harness 2 CYLINDER INSTALLATION The stationary end of the cylinder connects to the row cleaner s mount or the planter in some cases using top brackets and the moving end of the cylinder connects to the row cleaner s frame using the b...

Page 4: ...3 2 1 Smartclean bracket sets for different bundles SC BD1360 SC BD1345 SC BKW1360 SC BKW1345 SC 1360 UMOR SC 1360 UMOL SC 1345 UMOL SC 1345 UMOR SC BDC1360 ...

Page 5: ...installation on row cleaner mount The top brackets are installed directly on the mount using the same hole patterns as the row cleaner mount Left Picture The UMO top brackets are designed for all single or dual UMO at tachments and are installed as shown in the right picture They come in right and left sets and are used with their opposite side UMO 2 3 Bottom bracket installation on row cleaner Fr...

Page 6: ...s the end of its stroke Failure to do so will destroy the cylinder prema turely WA1360 frame Install the bottom bracket as shown in the picture Use 5 8 x 1 3 4 bolt Use 5 16 x 1 1 4 bolt 5 16 flat washer 5 8 bushing 5 16 nut N516CH 5 If installing the wheel in rear hole use 5 16 x 1 1 4 bolt two 5 16 flat washers 5 8 bush ing and 5 16 nut N516CH in front hole as shown in the below picture to preve...

Page 7: ... it doesn t have to be in stalled inside the cab However for better Bluetooth connectivity It is recommended to install it within the line of sight of the cab in a central location Open the plumbing box cover loosen ing the 3 8 locknuts on the top of the box and use the 3 8 holes under the box to attach and secure the plumbing box on the planter Use the template on page 20 for possible mounting ho...

Page 8: ...ct the box s Airbag outlet to the airbags circuit using the 1 4 tubing and tee fittings provided Use the provided zip ties to secure the tubes Make sure that the tubes will not be stretched or sharply bent during planter movement or folding unfolding It is highly recommended to follow the possible existing wiring harnesses or airbag tubing routes To make tubing easier you can start by connecting t...

Page 9: ...ludes an extra pressure regulator valve Bank 2 All the valves are shown in the picture There are four tubing routes as follows Route1 Tubing from air inlet to pressure regulators and directional valve pilot inlets Bank 1 pressure regulator connector Bank 2 pressure regulator for plant ers equipped with airbags or for Bi Directional Control Bank 1 has a Tee connection fitting when Bank 2 is availab...

Page 10: ...Route 3 Tubing from Directional valves outlets to Up and Down outlets Bank 1 pressure regulator outlet Directional Valve main inlet Route 2 Must include at least 2 loops Directional Valve extraction outlet Directional Valve retraction outlet Plumbing Box s Up Outlet Plumbing Box s Down Outlet Plumbing Box s Airbag Outlet Bank 2 pressure regulator outlet 9 ...

Page 11: ...plumbing box valve connection needs to be reconfigured as described bellow for bi directional control Step 1 Disconnect the tube ends only at the points shown in the picture Don t disconnect the other ends of the tubes Point 1 Up outlet Point 2 Down outlet Point 3 Airbag Outlet Point 4 Directional valve inlet Complete plumbed box is shown from left and right views in bellow pictures Check for any ...

Page 12: ...e open ends inside the box Plug the three open ends two hoses connected to the directional valve and direction al valve main inlet Follow the instruction in section 6 6 to test the Bi Directional control configuration Check for any leaks before closing the plumbing box cover 11 Step 2 Connect the Bank 1 pressure regulator outlet to the Up Outlet as shown in the picture Bank 1 pressure regulator ou...

Page 13: ...e the connectors labeled ORL A and ORL B and connect them to the provided ORI OLE controller box JCA00 009001 shown in the picture Locate the connector labeled PRES REG BANK 1 and connect it to the bank 1 pressure regulator in the box The bank 1 pressure regulator is the one farther from the air inlet outlets and has a tee connection fitting Secure the connector to the valve using the center bolt ...

Page 14: ...over Secure the harnesses converter box and ORIOLE controller box to the planter using the provided zip ties Directional valve retraction connector Directional valve extraction connector Tee connection fitting Directional valve If you ordered the double valve plumbing box with additional airbag valve SC ASSEMBLY 2 locate the connector labeled PRES REG BANK 2 and connect it to the bank 2 pressure r...

Page 15: ...n iOS or Android mobile device is the first step Go to the Google Play Store or the iOS App Store Search for Martin Till Smart Clean V2 Install the app titled Martin Till Smart Clean V2 6 2 Connect to your Martin Till SmartClean Follow the below steps to connect to the Martin Till SmartClean system 15 1 Notice the Bluetooth Not Connected message Click on the gear 2 Click on the Bluetooth label 3 I...

Page 16: ...pt will be dis played Click OK 6 After the device is successfully con nected a green Connected To Control ler message will be displayed momen tarily and the SmartClean device will be in the list of Connected Devices 6 3 Configure your Martin Till SmartClean The Martin Till SmartClean can have several different configurations The operator must se lect the proper configuration within the app by laun...

Page 17: ...ctual num ber to manually enter a value Actual pressurevalue 6 5 Single Valve Bank Air Bag NOTE To run this configuration the Part SC Assembly 2 2 Valves must be installed Not Connected State Bluetooth Not Connected and UP FLOAT DOWN buttons are all blue Connected State Select the direction pressureis applied Actual pressurevalue Select the targetpressureapplied by clicking the up and down buttons...

Page 18: ...sureapplied by clicking the up and down buttons or theactual num ber to manually enter a value 6 7 Dual Valve Bank Not Currently Supported The bi directional control configuration requires a 2 valve system Part No SC ASSEMBLY 2 and is not currently supported Not Connected State Bluetooth Not Connected and UP FLOAT DOWN buttons are all blue Connected State Select the direction pressureis applied Ac...

Page 19: ...This happens when another phone has been paired with thesystem Reset the circuit by turning off the power supply or disconnecting the connector between power and planters harnesses to unpair the other phone The compressor works continuouslyand doesn t build up pressure Check all the tubingand connections for air leaks The compressor works continuouslyand does build up pressure Verify thecompressor...

Page 20: ... This template is full scale Use it to mark drilling points Plumbing box dimensions are 11 5 X 6 25 X 6 25 Use 3 8 bolts or U bolts to install theplumbing box Bolts are not supplied 20 ...

Page 21: ...er tube supplied DC INLET to V1 V2 to air bags if used Cylinder UP connection Cylinder DOWNconnection SC ASSEMBLY 2 SMARTCLEAN AIR BAGCONTROL SC ASSEMBLY 2 BI DIRECTIONAL CONTROL Cylinder UP connection Cylinder DOWNconnection PLUG supplied Supply Air 120 PSI MAX ...

Page 22: ...Martin Industries LLC 206 Elk Fork Road Elkton KY 42220 Telephone 270 265 5817 E Mail martin martintill com The most trusted name in no till Established 1991 ...

Reviews: