Step 3 : Connect the Bank
-
2 pressure regulator outlet to the Down Outlet as shown in the pic-
ture.
Down Outlet
Bank
-
2 pressure regulator outlet
Step 4 : The retubing process is complete. You can leave the tubes with one open ends inside
the box. Plug the three open ends ( two hoses connected to the directional valve and direction-
al valve main inlet).
Follow the instruction in section 6.6 to test the Bi
-
Directional control configuration. Check for
any leaks before closing the plumbing box cover.
11
Step 2 : Connect the Bank
-
1 pressure regulator outlet to the Up Outlet as shown in the picture.
Bank
-
1 pressure regulator outlet
Up Outlet