Marlec Eng Co Ltd Installation Instructions
__________________________________________________________________________________________
Document No: SM124 Issue D 30.01.07
15
UP AND RUNNING
•
Before raising and securing the wind generator, check that:
1. All final mechanical checks have been made.
2. The cable is not trapped.
3. All electrical connections are secure and safe.
•
The wind generator can now be raised into position.
Take care to avoid all moving parts when raising and lowering the wind
generator.
•
When raised, secure the structure firmly in an upright position. The
performance of your Windcharger can be impaired if the pole is not vertical.
SPECIFICATION AND PERFORMANCE
0
2
4
6
8
10
12
14
0
5
10
15
20
25
30
35
40
WINDSPEED M/S
CHARGE CURRENT INTO 12v BATTERY (AMPS)
0
1
2
3
4
5
6
7
CHARGE CURRENT INTO 24v BATTERY (AMPS)
WINDSPEED CONVERSION
MPH = M/S x 2.23
Knots = M/S x 1.94