Marlec Eng Co Ltd Installation Instructions
__________________________________________________________________________________________
Document No: SM124 Issue D 30.01.07
13
polarity. Connect the Windc to cable + and Windcharger – to
cable –
Red is +Positive
Black is –Negative
5. Wrap the connection with insulation tape to secure/protect from the
environment. Alternatively join the cables using a latching type plug and
socket.
6. Locate the Windcharger into the tower whilst gently easing the cable
from the tower base to ensure the cable is not trapped. Secure the
Windcharger to the tower using the button cap screws and shake-proof
washers provided. Tighten using the 6mm Allen key supplied.
FINAL MECHANICAL CHECK
1. Check the tightness of the blade fixing screws and generator mounting
screws.
2. Check free rotation of the hub and yaw axis.