Marlec Eng Co Ltd Installation Instructions
__________________________________________________________________________________________
Document No: SM124 Issue D 30.01.07
10
Tower Preparation (Fig. 6)
Having selected a suitable pole from the guidelines on page 7:
1. The post adaptor fitted to the FM910-3 is designed to fit inside a
standard 41mm (1
⅝
") internal diameter tube. The adaptor is provided
with a flat on one side to clear the weld seam on seamed pipe.
2.
Mark and centre-punch two positions diametrically opposite, at 90° to
the pipe seam if necessary, 20mm (
NOTE: Use metric measurements for
this operation)
from the top of the tube.
3.
Drill two holes 10.5mm (
NOTE: Use metric measurements for this
operation)
in diameter on centre-punch positions.
Note: When using the Rutland Land Tower Kit, items 2 and 3 can be ignored as
the unit is pre-drilled.
BATTERIES
Fig.