ADJUSTMENTS
WARNING
At least twice a year, have an authorized
service person clean and adjust the unit for
maximum performance.
ADJUSTMENT FOR HIGH ALTITUDE LOCATIONS
The steamer has been factory set so that when it is ON,
and during the READY phase, it will maintain water tem-
perature in the steam generator tank at approximately
200
°
F (93
°
C) (just below water boiling point). However,
for high altitude locations, an authorized service agency
must adjust the steamer to achieve this temperature.
CAUTION
Shut off main electrical power to unit.
DOOR GASKET REPLACEMENT
The cooking compartment door gaskets are made of a
silicone-type rubber material that is very durable but sub-
ject to wear during normal operation. Should the gasket
leak replace it.
1. Open the cooking compartment door.
2. Remove the four screws on the outside of the door
frame, and remove the door panel assembly.
3. Remove the six screws from the gasket plate in the
door panel assembly.
4. Remove the gasket plate and the door gasket from
door panel.
5. Install the new door gasket to the door panel. Re-
place the gasket plate and six screws.
6. Reassemble the door panel assembly in the door
frame using the four screws.
7. Gasket replacement is now complete.
Door may be difficult to close until gasket has compressed
to conform to opening. Leaving door closed overnight will
compress gasket.
EXTERIOR PANEL REMOVAL
WARNING
To prevent hazard in servicing the cooker, be
certain the cold water shut-off valve is closed,
and the electrical disconnect circuit breaker
for the Cooker unit is OFF before removing
side panels.
Access to all internal plumbing and electrical assemblies
is from the right side. The right-side panel is removed by
removing the bottom screws from panel.
Summary of Contents for ETP-10E
Page 8: ...WIRING DIAGRAMS 3E 10067R8 ...
Page 9: ...WIRING DIAGRAMS ...
Page 10: ...WIRING DIAGRAMS ...
Page 11: ...WIRING DIAGRAMS ...
Page 12: ...WIRING DIAGRAMS ...
Page 13: ...WIRING DIAGRAMS ...
Page 14: ...NOVEMBER 1 2016 14 ETP 5E ETP 10E STEAMER EXPLODED VIEW ...
Page 20: ...NOVEMBER 1 2016 20 ETP 5E ETP 10E CABINET ASSEMBLY ...