General Maintenance
GENERAL MAINTENANCE SCHEDULE
Item
Interval
Procedure
Air Filter
6 months
Inspect for dirt. Replace if necessary.
Compressor Contactor
1 year
Inspect for pitted or burned points. Replace if necessary.
Condensate Drain
1 year
Inspect for clogs. Clean if necessary.
Heat exchanger
As required*
Clean as per HEAT EXCHANGER FLUSHING PROCEDURE below.
*Whenever system performance is reduced.
Outdoor Unit
Weekly
Inspect for and clear away debris or leaves in air coil intake, and ice buildup
under unit that is approaching air coil.
COAXIAL HEAT EXCHANGER FLUSHING PROCEDURE - INDOOR LOOP
STEP 1
Isolate the heat exchanger by closing off Indoor IN and Indoor OUT in-line ball valves.
STEP 2
Connect a compressed air and a drain pipe to the Indoor IN and Indoor OUT hose bibs and blow the water
or anti-freeze solution into a clean 5 gallon bucket.
STEP 3
Connect a purge cart to the pump module purge ports.
STEP 4
Place 2 gallons of RYDLYME or similar lime-removing solution in the purge cart. Circulate the fluid through
the heat exchanger for at least 2 hours (3 recommended).
STEP 5
Disconnect the purge cart and dispose of the solution. RYDLYME is non-toxic and biodegradable and as
such can be poured down a drain. Clean the purge cart thoroughly.
*
Depending on the plumbing, there should be either unions or boiler drains for to access the heat exchanger.
STEP 6
Connect fresh water and a drain to the pump module purge ports and flush the exchanger for several
minutes.
STEP 7
Blow the heat exchanger out with compressed air as per STEP 2 and dump the water down a drain.
STEP 8
Connect the purge cart to the pump module purge ports. Re-fill and purge the heat exchanger with as per
standard procedures (the anti-freeze from STEP 2 can be re-used).
STEP 9
Disconnect the purge cart and set the pump module valves back to the original positions.
STEP 10
Operate the system and check for improved performance.
Summary of Contents for ATF-45
Page 12: ...Page 12 002000MAN 01 1 Jun 2018...
Page 15: ...1 Jun 2018 Page 15 002000MAN 01...
Page 16: ...Page 16 002000MAN 01 1 Jun 2018...
Page 17: ...1 Jun 2018 Page 17 002000MAN 01...
Page 18: ...Page 18 002000MAN 01 1 Jun 2018...
Page 20: ...Page 20 002000MAN 01 1 Jun 2018...
Page 21: ...1 Jun 2018 Page 21 002000MAN 01...
Page 22: ...Page 22 002000MAN 01 1 Jun 2018...
Page 23: ...1 Jun 2018 Page 23 002000MAN 01...
Page 24: ...Page 24 002000MAN 01 1 Jun 2018...
Page 25: ...1 Jun 2018 Page 25 002000MAN 01...
Page 27: ...1 Jun 2018 Page 27 002000MAN 01...
Page 31: ...1 Jun 2018 Page 31 002000MAN 01...
Page 84: ...Page 84 002000MAN 01 1 Jun 2018 Wiring Diagram 208 230 1 60...
Page 85: ...1 Jun 2018 Page 85 002000MAN 01 Electrical Box Layout 208 230 1 60...
Page 86: ...Page 86 002000MAN 01 1 Jun 2018 Wiring Diagram 208 3 60...
Page 87: ...1 Jun 2018 Page 87 002000MAN 01 Electrical Box Layout 208 3 60...
Page 88: ...Page 88 002000MAN 01 1 Jun 2018 Wiring Diagram 460 3 60...
Page 89: ...1 Jun 2018 Page 89 002000MAN 01 Electrical Box Layout 460 3 60...
Page 90: ...Page 90 002000MAN 01 1 Jun 2018 ACE 45 55 Wiring Diagram ACE 65 75 Wiring Diagram...
Page 91: ...1 Jun 2018 Page 91 002000MAN 01...
Page 92: ...Page 92 002000MAN 01 1 Jun 2018...
Page 93: ...1 Jun 2018 Page 93 002000MAN 01...
Page 94: ...Page 94 002000MAN 01 1 Jun 2018 Dimensions ATF 45 Left Return INDOOR UNIT OUTDOOR UNIT ACE 45...
Page 95: ...1 Jun 2018 Page 95 002000MAN 01 INDOOR UNIT OUTDOOR UNIT ACE 45 Dimensions ATF 45 Right Return...
Page 96: ...Page 96 002000MAN 01 1 Jun 2018 INDOOR UNIT OUTDOOR UNIT ACE 55 Dimensions ATF 55 Left Return...
Page 97: ...1 Jun 2018 Page 97 002000MAN 01 INDOOR UNIT OUTDOOR UNIT ACE 55 Dimensions ATF 55 Right Return...
Page 100: ...Page 100 002000MAN 01 1 Jun 2018 ACE 65 75 ACE 45 55...