BOOM MAINTENANCE
NBT40 SERVICE MANUAL
4-24
Published 8-01-2017 Control # 287-11
4.
Clean and inspect all cable assemblies according to wire
rope inspection procedures in this section. Pay
particular attention to any wire breakage at the end
connections. Replace cable assemblies as required.
Lubricate all cable assemblies as required. Lubricate all
cable assemblies before reinstalling them in boom.
5.
Inspect all sheave pins for nicks, gouges or pitting due to
rust in the bearing surface area. Replace if any damage
is evident.
6.
Inspect all grease fittings and grease paths in pins to
ensure proper grease flow. Clean and replace as
required.
7.
Replace all lubricating plugs in all wear pads as
necessary.
8.
Apply multipurpose grease (MPG) to all wear pad
surfaces.
Five Section Boom Assembly
NOTE:
Torque all hardware to their specified torque value
See “Fasteners And Torque Values” on page 1-7.
NOTE:
Apply medium strength thread locking adhesive/
sealant using Loctite Type 243 according to Loctite
recommendations to all hardware and torque.
NOTE:
Do not use Loctite on any cable threaded ends.
Always use the jam nuts and/or nuts provided
.
NOTE:
Install cables in their natural untwisted condition.
Do not twist cables. Twisting of cables will result in
d a m a g e o r f a i l u r e o f c a b l e . W h e n i n i t i a l l y
assembling threaded ends of cables, thread the
first nut on past the flat so adjustment can be made
later.
NOTE:
Apply multipurpose grease (MPG) to all wear pads
and contact surfaces.
For reference, front (tip) is sheave case end, rear (base) is
hoist mount end, left and right are viewed from rear to front.
5th Section Boom
1.
Assemble upper loadline sheaves (120) and bearings
(121) into the 5th stage sheave case (5).
a.
Install sheave pin (126) in left side of the upper
sheave case.
NOTE:
Install spacers (122) between sheaves and
between sheaves and side plates.
b.
Install small spacer (122).
c.
Install sheaves (120,121) near the sheave case side
plates with the grease fitting (95) facing the side
plate to allow for greasing.
d.
Install small spacer (122).
e.
Install center sheave's (120,121) with grease fitting
(95) facing either side.
f.
Install top sheaves (120,121) to the left hand side of
the boom with the spacer (123) to the right hand
side.
g.
Install keeper plates (125) to both sides of the
sheave case using bolt (109) and washer (21).
2.
Assemble lower loadline sheaves (120) and bearings
(121) into the 5th stage sheave case (5).
a.
Install sheave pin (164) in left side of the sheave
case.
NOTE:
Install washers (122) between sheaves and
between sheaves and side plates.
b.
Install small spacer (122).
c.
Install sheaves (120,121) near the sheave case side
plates with the grease fitting (95) facing the side
plate to allow for greasing.
d.
Install small spacer (122).
e.
Install center sheave's (120) with grease fitting
facing either side.
f.
Install sheaves (120) to the right hand side of the
boom.
g.
Install the spacer (122.
h.
Install link (128) to outside of sheave case.
i.
Install keeper plates (163) to right side of the sheave
case using bolt (109) and washer (21).
j.
Install keeper plates (125) to left side of the sheave
case using bolt (109) and washer (21).
k.
Install tube (60) in lower forward sheave case.
l.
Install hitch pins three (127) in sheave case.
3.
Install bottom rear wear pad (110), shims (135) with
capscrew (103) to the base of the 5th stage boom (5).
4.
Install two side wear pads (134) and shims (41) onto the
rear base of the 5th stage boom (5). Shim according to
calibration instructions in this section or as pads were
originally removed and tagged.
NOTE:
Apply multipurpose grease (MPG) to all wear pads
and contact surfaces.
5.
Raise and support the 5th stage boom (5) in front of the
4th stage boom (4).
a.
Route threaded end of 3/4/5 extend cables (96)
through the tip of the 4th stage boom (4) and out the
base of the 4th stage boom.
b.
Loop the button end of 3/4/5 extend cables (96)
back beyond the cable anchor on the 5th stage
Reference Only
Summary of Contents for National Crane NBT40 Series
Page 1: ...Service Manual National Crane NBT40 Series R e f e r e n c e O n l y ...
Page 2: ...R e f e r e n c e O n l y ...
Page 216: ...SCHEMATICS NBT40 SERVICE MANUAL 10 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Page 218: ...NBT40 SERVICE MANUAL APL 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Page 219: ...R e f e r e n c e O n l y ...
Page 220: ...R e f e r e n c e O n l y ...